Commit Graph
320 Commits
Author SHA1 Message Date
istos 3042648643 board: 57 → to-do (istos) 2026-08-02 07:39:47 +02:00
istos 616f5afc17 board: 56 → to-do (istos) 2026-08-02 07:39:45 +02:00
istos 37b96eb88e board: 52 → done (istos) 2026-08-02 07:38:43 +02:00
istos 829e13ed3b board: 47 → done (istos) 2026-08-02 07:38:43 +02:00
istos 4c40e62532 board: 53 → done (istos) 2026-08-02 07:37:27 +02:00
Ronald AshriandGitHub 29438fbfc3 Merge pull request #46 from 12vectors/phase/53-the-board-stops-fighting-you
53 — Phase: the board stops fighting you
2026-08-02 07:37:19 +02:00
istos d978d6ad42 tasks: 59 also clears the workspaces a phase leaves behind
complete_task works from the stem of the card it is completing, so a
finished phase leaves every member's worktree, local branch and remote
branch in place — measured on 53: three worktrees at 3.8M each and two
member branches still on origin. The sweep now removes them, with the
existing rule intact for a member that never merged: there is work in
that worktree, so it stays.
2026-08-02 07:33:55 +02:00
istos 93f0304a2c tasks: card 60 — a phase stacks its pull requests
Today the runner merges each member into the phase branch as soon as CI
is green, which closes the member's PR and flattens the stack as it is
built: phase 53 handed back one +807 diff for two cards. Stop merging
during the run, chain each member's branch on the one before it, and let
the phase card sit on top. Carries one open question — how the stack
lands — which is a decision only the author can make.
2026-08-02 07:27:37 +02:00
istos 2b9199780f board: 53 PR opened (istos) 2026-08-02 07:20:19 +02:00
istos b4b1f73890 board: 53 → review (istos) 2026-08-02 07:18:55 +02:00
istos 7494f79cdc board: 53 phase log (istos) 2026-08-02 07:18:55 +02:00
istos e683387388 board: 53 phase log (istos) 2026-08-02 07:18:53 +02:00
istos e894b22c7c phase: merge task/47-an-archive-button-on-the-card into phase/53-the-board-stops-fighting-you 2026-08-02 07:18:51 +02:00
istos bedbb56537 phase: merge origin/main into phase/53-the-board-stops-fighting-you 2026-08-02 07:18:48 +02:00
istos dbaa7c9282 board: 53 phase log (istos) 2026-08-02 07:18:46 +02:00
istos 4ce8b11d9b board: 47 PR opened (istos) 2026-08-02 07:17:20 +02:00
istos a6291ec7ba board: 47 → review (istos) 2026-08-02 07:17:14 +02:00
istos c256d80efc tasks: phases get a room of their own — 56, 57, 58, 59
56 takes phase members off the Board view (counts describe what is
visible; membership is the only thing hiding them, so done, archived or
an edited list gives them back). 57 draws them instead: a Phases view,
one swimlane per phase, the phase log under it, run-again where the halt
is. 58 refuses to move a phase card while a member has a live agent —
'hold the phase first' — and covers archive, which is the path that
would really have hurt. 59 sweeps merged members to done/ when the phase
merges, so an ending reads as an ending.
2026-08-02 07:15:00 +02:00
istos b6091809fe tasks: card 55 — a headless run gets one turn, and nothing says so
Card 47's agent ended its turn with 'the suite is still running; I'll
wait for the monitor', which in a one-shot claude -p run is the end of
the run — 314 lines of finished, passing work staged and never
committed. The prompt never states that the run is a single turn or that
uncommitted work dies with it.
2026-08-01 19:57:50 +02:00
istos 661dd89af4 An archive chip on the card, where the card is
Every card in backlog/, to-do/ and done/ gets a ⌸ chip at the end of its
footer row — the tray's own glyph — arming on the first click and
archiving on the second, through the routes and the ARCHIVE_FROM guard
that already existed. In-progress and review cards do not get one: the
board offers what it will do.

Committed by hand after the run that wrote it ended mid-turn without
committing. The work is the agent's; the suite passes on it (875 tests)
and it is unchanged from what the run left staged.
2026-08-01 19:57:03 +02:00
istos 887fa43e36 board: 53 phase log (istos) 2026-08-01 17:28:20 +02:00
istos 91622d1ecf phase: merge origin/main into phase/53-the-board-stops-fighting-you 2026-08-01 17:28:18 +02:00
istos 89763d23f9 board: 47 Work report filed (istos) 2026-08-01 17:27:46 +02:00
istos bb35ca1985 phase: merge origin/main into phase/53-the-board-stops-fighting-you 2026-08-01 17:16:30 +02:00
istos 98ceb1bb17 board: 53 phase log (istos) 2026-08-01 17:15:58 +02:00
istos fc9b6fa14a board: 47 → in-progress (istos) 2026-08-01 17:15:58 +02:00
istos 3d29f0f4c0 board: 53 phase log (istos) 2026-08-01 17:15:58 +02:00
istos fa7b92110c board: 52 PR opened (istos) 2026-08-01 17:15:57 +02:00
istos 221151f9b0 phase: merge task/52-a-redraw-throws-away-where-you-were-looking into phase/53-the-board-stops-fighting-you 2026-08-01 17:15:56 +02:00
istos c1cd433a91 phase: merge origin/main into phase/53-the-board-stops-fighting-you 2026-08-01 17:15:53 +02:00
istos 3b01f5c7c5 board: 52 → review (istos) 2026-08-01 17:15:50 +02:00
istos 2350491209 board: 52 Work report filed (istos) 2026-08-01 17:15:50 +02:00
istos 419daef5e6 A redraw keeps where you were looking
renderBoard() starts with `board.innerHTML = ''` and rebuilds every
column, so each column's scrolling .drop was a brand-new node on every
pass — and a new node's scrollTop is 0. render() runs on every SSE frame
and a working agent emits an event per tool use, so a column being read
snapped back to the top several times a minute: worst exactly when there
is most to read. The same wipe threw away #board's horizontal position,
and the same demolition costs the session timeline, the sessions rail,
the Focus view, the drawer, and the activity log's place whenever it was
not stuck to the bottom.

Rather than a reconciling render — the real cure, and a far larger change
to the way the page works — the position is paid for separately: note
where each scroller was before the wipe, put it back once the new nodes
are in, both halves inside the same synchronous render so nothing
flashes. Keys are stable names rather than nodes (the stage slug for a
column, the session id for a timeline), because the node is what does not
survive. Restoring clamps, so a column whose cards moved on lands at its
new bottom instead of past it, and one now shorter than its own viewport
lands at the top instead of at a negative offset.

A `v:` prefix marks a key belonging to a view, and switching views drops
those: coming back is a fresh look, not a stale offset from a previous
visit. The activity log spans every view, so its key carries no prefix
and outlives the switch. The two behaviours that were already right are
left alone and now have tests holding them there — the log still follows
the newest line when it was stuck to the bottom (that reading runs after
the restore, so it wins), and the drawer still opens at the top when you
select a different card, which falls out of keying the drawer per
document rather than being fought for.

The helpers run for real under node, as tests/test_drawer_markdown.py
already does with md(); the source-level invariants beside them hold the
mark/restore pairs in order around each wipe, and one of them fails if a
new scrolling element is added to the CSS without a renderer keeping its
place.

    python3 -m unittest discover -s tests   → 854 tests, ok
2026-08-01 17:15:30 +02:00
istos bf1fb992b9 phase: merge origin/main into phase/53-the-board-stops-fighting-you 2026-08-01 17:01:58 +02:00
istos 21a819080a tasks: card 54 — a work agent must refuse a phase card
/api/phase/run guards itself (phases._phase_card refuses a non-phase);
/api/agent/start has no phase check at all, so a stale tab launched an
ordinary work agent on card 53 and it implemented both members itself.
The gate that was missing is on the older feature — the usual shape:
a new capability guards its own front door and leaves the neighbour's
open.
2026-08-01 17:01:44 +02:00
istos 1eaca0734b phase: merge origin/main into phase/53-the-board-stops-fighting-you 2026-08-01 17:00:51 +02:00
istos 438a1d8a04 board: 53 phase log (istos) 2026-08-01 17:00:44 +02:00
istos ea1f0def96 board: 52 → in-progress (istos) 2026-08-01 17:00:43 +02:00
istos bfdcdec000 board: 53 phase log (istos) 2026-08-01 17:00:41 +02:00
istos bef6a642f7 board: 53 → in-progress (istos) 2026-08-01 16:48:36 +02:00
istos 25311aa2bc board: 53 → to-do (istos) 2026-08-01 16:48:28 +02:00
istos 6744177c50 tasks: phase 53 — the board stops fighting you
Runs 52 (scroll position survives a redraw) then 47 (an archive chip on
the card). Neither depends on the other, so neither carries a Depends on
line — they are phased because they both edit board.html, and two agents
branched from main would collide in it. Sequencing gives the second one
the first one's work as its branch point.
2026-08-01 16:47:34 +02:00
istos cb29504ff0 board: 51 → done (istos) 2026-08-01 16:44:20 +02:00
Ronald AshriandGitHub 09ab2c988f Merge pull request #43 from 12vectors/task/51-add-a-card-to-a-phase-from-the-board
51 — Add a card to a phase without opening the file
2026-08-01 16:44:16 +02:00
istos 6d1ebdef43 board: 51 PR review filed (istos) 2026-08-01 16:39:06 +02:00
istos c8ff9cb356 board: 51 PR opened (istos) 2026-08-01 16:34:15 +02:00
istos 648566e8fb board: 51 → review (istos) 2026-08-01 11:23:41 +02:00
istos a1a9a6f921 board: 51 Work report filed (istos) 2026-08-01 11:23:40 +02:00
istosandClaude Opus 5 463b35bdaf A card joins a phase without the file being opened
Phases are meant to arrive whole — members listed, dependencies filled in, readable in a diff before any of it runs. This is the other case: the card you decide belongs after all.

⟶ phase sits on backlog/ and to-do/ cards that are not already in a phase and are not phase cards themselves, and opens a sheet naming the phase cards waiting in to-do/ with what each already holds. Picking one appends `- <n> — <title>` to the end of that phase's ## Cards — the way a person writes it, because the section is authored and read by hand and a machine-shaped line is how a format stops being pleasant.

Only to-do/. A phase in in-progress/ is running: its branch exists and its members are being worked in the order the list had when it started, so appending mid-flight is a different feature with different questions. Offer it and someone finds that out the hard way. No phase waiting there and the action is absent rather than present and empty.

Nothing else moves. One line into the phase card, nothing at all into the card added — membership runs one direction and joining a phase is not a commitment to start it. The append goes out through append_to_section, the same door the phase log uses, so it commits itself under BOARD_COMMIT_MOVES, reaches the other boards, and reads the phase card off the disk rather than off a render: two boards adding to one phase produce two lines, not a lost one.

Co-Authored-By: Claude Opus 5 <noreply@anthropic.com>
2026-08-01 11:21:27 +02:00
istos 24f118df48 board: 51 → in-progress (istos) 2026-08-01 11:09:21 +02:00