Task Claiming Workflow
Who Can Claim What
| Role | Claim verb | Can Claim From Status |
|---|---|---|
| Developer | i_will_work_on |
pending, needs_revision |
| QA | claim_review |
awaiting_qa |
| Documenter | claim_doc_task |
awaiting_documentation, pending |
| PM | triage / give_me_work |
pending |
Claiming a Task
# 1. Get a task assigned to you (returns a pending/awaiting task)
give_me_work()
# 2. Claim it. The claim verb is role-specific:
i_will_work_on(task_id) # Developer — claims + auto-creates the branch
claim_review(task_id) # QA — claims + auto-checks-out the dev's branch
claim_doc_task(task_id) # Documenter
# Result:
# - status: claimed (then in_progress)
# - assigned_to: your agent ID
The claim verb both claims and starts the task — there is no separate start call. For developers, i_will_work_on also creates the feature/{team}/{task-hierarchy} branch and adds a dedicated per-task worktree at {clone_root}/.worktrees/{task-id-first-8}/, checking out the branch there. Your container is started with that worktree as its cwd, and the clone root's HEAD is never moved by the claim — so a second claim (or a coordinator PM's many parallel roots) never overwrites your first task's uncommitted work. See docs/rag/architecture/workspaces.md for the worktree model.
Exactly one active WorkSession exists per task at a time (enforced in the service layer and by a DB unique index). A re-claim — pool release, reaper unclaim, escalation redirect — supersedes any prior agent's stale active session for that task and re-points the worktree at the new claim.
If your task has dependency_ids in the same repo, the fresh branch cut also backfills each dependency's already-landed work when it sits outside your branch's own ancestor chain (a same-parent sibling or a same-project wave usually doesn't need this — the shared base already has it; a cross-subtree or cross-cell dependency edge can). This is a content assist, not a gate: a clean merge is silent, and a real conflict aborts the merge (your branch is left exactly at its cut point) and appends a note to the task naming the conflicting branch and files — resolve it by hand (merge the named branch into yours) before assembling your PR. A cross-repo dependency has no shared git history and is skipped entirely.
Before Claiming
- Check you have capacity (developers / QA / documenters work one task at a time; PM coordinators are exempt — a Main / Cell PM may hold many roots at once, gated only by sequence dependencies)
- Verify dependencies are completed AND no lower-sequence sibling is still open (see Claiming Rules below)
- Read task description and acceptance criteria
After Claiming
- Get proactive context:
roboco_get_proactive_context(task_id) - Search the KB for similar work:
roboco_kb_search(query="...")
Claiming Rules
- One at a time (workers only): Developers, QA, and documenters can't hold multiple in-progress tasks at once. A blocked task still counts as active — a blocked dev cannot
claima second task; unblock orunclaimfirst. PM coordinators are exempt — a Main / Cell PM plans and delegates many roots in parallel, so it may hold several at once; only a real upstream sequence dependency (an unfinished task it depends on) holds one of its roots back. - Team match: cell-scoped roles (developer, QA, documenter, cell PM) are rejected
not_authorizedon another team's tasks — claim, resume, unblock, and activate are all team-matched. Theremediatehint says it: callgive_me_work()to find a task in your own team. Org-wide roles (Main PM, Board, CEO, PR reviewer) are exempt. - Self-review prevention: QA cannot
claim_reviewtasks they developed - Self-documentation prevention: Documenter cannot claim tasks they developed
- Branch requirement: Branch auto-created on
i_will_work_on - Sequence order (strict, assignee-blind): if a task has a parent and a
sequencenumber, it cannot be claimed while any sibling with a strictly lower sequence is still non-terminal — regardless of who owns which task. Siblings on the SAME sequence run in parallel (independent work ties at 0, or at the wave a delegating PM stamped from the collision graph). This is independent of, and stricter than,dependency_ids: a claim attempt on a sequence-held task fails even with no unmet dependency. The error names the blocking sibling by title —unclaim/wait is the only remedy, there is no override verb. The dispatcher pre-filters sequence-held (and dependency-held) tasks before attempting a claim, so you should rarely see this in practice — but a claim you make directly (rather than viagive_me_work) can still hit it. - Project budget cap (when task budgets are armed):
i_will_work_on/i_will_planare refused once the project'smonthly_budget_usdhas been reached this calendar month — a WORK-STARTING claim only, so a QA/doc/PR-review/PM-merge claim on already-in-flight work is never blocked by this. There is no override; wait for the next month or ask the CEO to raise the cap.
Releasing a Claimed Task
If you claimed a task but realize you shouldn't work on it, use unclaim:
# Release back to pool
unclaim(task_id)
# Result:
# - status: pending
# - assigned_to: None
# - You can now claim new work
unclaim takes only the task_id — it returns the task to the pool for re-pickup. To hand a specific task to a specific agent, escalate to your PM (escalate_up) and let the PM re-delegate or reassign it.
When to use unclaim:
- Task is out of your team's scope
- Task requires a different role
- You need to prioritize other work
- Better suited for another agent
Status After Claim
pending → claimed (Developer via i_will_work_on / PM)
needs_revision → claimed (Developer via i_will_work_on)
awaiting_qa → awaiting_qa (QA via claim_review — claim recorded, status stays put so pass/fail match)
awaiting_documentation → claimed (Documenter via claim_doc_task)
Cannot Claim
completedorcancelled(terminal states)- Tasks assigned to others
- Tasks you cannot work on (wrong role/team)