The claim verb both claims and starts the task — there is no separate `start` call. For developers, `i_will_work_on` also creates the `feature/{team}/{task-hierarchy}` branch and **adds a dedicated per-task worktree** at `{clone_root}/.worktrees/{task-id-first-8}/`, checking out the branch there. Your container is started with that worktree as its cwd, and the clone root's HEAD is never moved by the claim — so a second claim (or a coordinator PM's many parallel roots) never overwrites your first task's uncommitted work. See `docs/rag/architecture/workspaces.md` for the worktree model.
Exactly one active WorkSession exists per task at a time (enforced in the service layer and by a DB unique index). A re-claim — pool release, reaper unclaim, escalation redirect — supersedes any prior agent's stale active session for that task and re-points the worktree at the new claim.
If your task has `dependency_ids` in the same repo, the fresh branch cut also backfills each dependency's already-landed work when it sits outside your branch's own ancestor chain (a same-parent sibling or a same-project wave usually doesn't need this — the shared base already has it; a cross-subtree or cross-cell dependency edge can). This is a content assist, not a gate: a clean merge is silent, and a real conflict aborts the merge (your branch is left exactly at its cut point) and appends a note to the task naming the conflicting branch and files — resolve it by hand (merge the named branch into yours) before assembling your PR. A cross-repo dependency has no shared git history and is skipped entirely.
1. Check you have capacity (developers / QA / documenters work one task at a time; **PM coordinators are exempt** — a Main / Cell PM may hold many roots at once, gated only by sequence dependencies)
- **One at a time (workers only)**: Developers, QA, and documenters can't hold multiple in-progress tasks at once. A **blocked** task still counts as active — a blocked dev cannot `claim` a second task; unblock or `unclaim` first. **PM coordinators are exempt** — a Main / Cell PM plans and delegates many roots in parallel, so it may hold several at once; only a real upstream **sequence dependency** (an unfinished task it depends on) holds one of its roots back.
- **Team match**: cell-scoped roles (developer, QA, documenter, cell PM) are rejected `not_authorized` on another team's tasks — claim, resume, unblock, and activate are all team-matched. The `remediate` hint says it: call `give_me_work()` to find a task in your own team. Org-wide roles (Main PM, Board, CEO, PR reviewer) are exempt.
- **Sequence order (strict, assignee-blind)**: if a task has a parent and a `sequence` number, it cannot be claimed while any sibling with a strictly lower sequence is still non-terminal — regardless of who owns which task. Siblings on the SAME sequence run in parallel (independent work ties at 0, or at the wave a delegating PM stamped from the collision graph). This is independent of, and stricter than, `dependency_ids`: a claim attempt on a sequence-held task fails even with no unmet dependency. The error names the blocking sibling by title — `unclaim`/wait is the only remedy, there is no override verb. The dispatcher pre-filters sequence-held (and dependency-held) tasks before attempting a claim, so you should rarely see this in practice — but a claim you make directly (rather than via `give_me_work`) can still hit it.
- **Project budget cap** (when task budgets are armed): `i_will_work_on` / `i_will_plan` are refused once the project's `monthly_budget_usd` has been reached this calendar month — a WORK-STARTING claim only, so a QA/doc/PR-review/PM-merge claim on already-in-flight work is never blocked by this. There is no override; wait for the next month or ask the CEO to raise the cap.
`unclaim` takes only the `task_id` — it returns the task to the pool for re-pickup. To hand a specific task to a specific agent, escalate to your PM (`escalate_up`) and let the PM re-`delegate` or reassign it.