mirror of
https://github.com/rennf93/roboco.git
synced 2026-08-03 07:23:24 +02:00
Markdown and editors soft-wrap on their own, so the manual ~75-char line breaks across the docs added nothing but noise. Join wrapped prose, list items, and paragraphs into single lines across 67 docs — README, CLAUDE.md, deployment, usage, the RAG knowledge base, and the agent role prompts. Whitespace-only: code fences, tables, and blockquote alerts are byte-identical and the change is token-verified (no content altered). Applied with a deterministic reflow tool (committed separately). Also lands two doc edits that were awaiting commit: the measured under-load resource numbers in usage.md and the pr_reviewer additions to the org-structure RAG doc.
74 lines
3.4 KiB
Markdown
74 lines
3.4 KiB
Markdown
# Pull Request Creation
|
|
|
|
## When PRs Are Created
|
|
|
|
PRs are opened **before** QA review, not during `awaiting_documentation`. The choreographer creates the PR as a side-effect of the developer's `open_pr(task_id)` transition (`verifying → awaiting_qa`).
|
|
|
|
This is by design: QA reviews the real PR diff on GitHub, and the downstream PM/CEO approval chain operates on a PR that already exists.
|
|
|
|
You do **not** call any tool to create a PR. There is no `roboco_git_create_pr` MCP tool.
|
|
|
|
## How the dev triggers it
|
|
|
|
```python
|
|
# 1. Make commits as you work (auto-pushes, no separate push step)
|
|
commit(message="feat(api): add Redis rate limiter",
|
|
files=["roboco/api/routes/rate.py", "tests/integration/test_rate.py"])
|
|
|
|
# 2. Once acceptance criteria are implemented + tested, hand off to QA.
|
|
# The choreographer opens the PR here, sets pr_number/pr_url on the
|
|
# task, and transitions verifying → awaiting_qa.
|
|
open_pr(task_id="<task>")
|
|
```
|
|
|
|
The transition enforces (`enforcement/task_lifecycle.py`):
|
|
|
|
- `self_verified=True` — set when you call `i_am_done()` or `verify(task_id)` first
|
|
- `commits` non-empty — at least one commit on the task
|
|
- `progress_updates` non-empty — at least one note on what changed
|
|
- `pr_number` is set automatically by the choreographer; you don't pass it
|
|
|
|
If any precondition is missing, the verb returns an envelope explaining what's missing and how to remediate.
|
|
|
|
## PR Title and Body
|
|
|
|
Generated from templates in `roboco/templates/git/pr_internal.py` and `roboco/templates/git/pr_root.py`. You don't write the body by hand — it's filled with task title, acceptance criteria, the dev's notes, and the standard traceability links.
|
|
|
|
Title format: `[TASK-{root-id:8}:{task-id:8}] {task-title}`.
|
|
|
|
## Parallel Documenter Phase
|
|
|
|
After QA passes, the task transitions to `awaiting_documentation` and runs documenter + dev in parallel:
|
|
|
|
| Agent | Action | Flag set |
|
|
|-------|--------|----------|
|
|
| Documenter | Writes docs files, then `i_documented(task_id, notes, files)` | `docs_complete=True` |
|
|
| Developer | (already done by the time we get here) | `pr_created=True` |
|
|
|
|
Task transitions to `awaiting_pm_review` when both are true.
|
|
|
|
## PM Merges via `complete`
|
|
|
|
After `awaiting_pm_review`, the Cell PM calls `complete(task_id, notes)`. The choreographer:
|
|
|
|
1. Verifies all subtasks are in a terminal state
|
|
2. Verifies the PR is reviewable
|
|
3. Merges the leaf PR into the parent branch (squash by default)
|
|
4. Transitions the task to `completed`
|
|
|
|
For the root parent, **Main PM**'s `complete` opens the master PR and escalates to CEO via `escalate_to_ceo` semantics.
|
|
|
|
There is no `roboco_git_merge_pr` MCP tool.
|
|
|
|
## Prerequisites
|
|
|
|
- **Git token:** the project must have an encrypted GitHub PAT set on `projects.git_token_encrypted`. Without it, the workspace clone — and therefore everything downstream — fails with `WorkspaceError`.
|
|
- **Token scope:** `repo` (for branch push, PR create, PR merge).
|
|
- **Default branch:** `projects.default_branch` is the merge target for the master PR (typically `master`).
|
|
|
|
## Troubleshooting
|
|
|
|
- `NO_COMMITS` on `open_pr` → call `commit(...)` first; nothing to open a PR over.
|
|
- `NO_PR` on `pass`/`fail` → the choreographer didn't open a PR; check the workspace state with `roboco_git_status` and re-call `open_pr` once the workspace is clean.
|
|
- `FORCE_PUSH_FORBIDDEN` → only the CEO may force-push. If your branch diverged, `unclaim` and re-`claim` the task; the choreographer rebuilds the branch.
|