mirror of
https://github.com/rennf93/roboco.git
synced 2026-08-03 07:23:24 +02:00
* feat(sandbox): on-demand request_sandbox verb replaces eager provisioning Sandboxes were provisioned at every agent spawn for opted-in projects, so every role paid the sidecar spin-up and a provisioning failure refused the spawn. Provisioning now happens when an agent asks: the request_sandbox do-verb (dev + QA) reaches the orchestrator through ContentActionsDeps, ensure_sandbox provisions idempotently with an in-memory per-agent cache (evicted at teardown and janitor sweep), and creds return in the envelope payload including ready-to-export ROBOCO_TEST_* values. Spawn now only injects a marker env naming the available services plus a briefing line; sandbox failures can no longer refuse a spawn. Teardown lifecycle unchanged. * feat(sandbox): harden request_sandbox + Phase 3 wiring proof and docs Hardening from adversarial review: ensure_sandbox now provisions the project's full opted-in set on first request (a later superset can never tear down a live sandbox mid-use), serializes per-agent behind an asyncio lock (a client timeout-retry no longer races its own in-flight provision), and verifies container liveness on every cache hit (a dead sandbox evicts and re-provisions instead of serving dead creds). MCP client budget 720->1080s for the full-set cold case. Phase 3: e2e smoke wiring test (manifest grants + guard-chain envelopes over the real API), sandbox-db/tools/map docs and CLAUDE.md rewritten for on-demand. * feat(sandbox): release sandboxes when the agent's work ends CEO directive: sidecars must not dangle once the agent is done. The six work-ending verbs (i_am_done, unclaim, i_am_idle, pass_review, fail_review, i_documented) now release the caller's sandbox best-effort on their success path via release_sandbox (lock + teardown + cache evict; a no-sandbox agent costs a dict lookup). Container removal and the janitor remain the backstop; a re-request provisions fresh. * test(sandbox): monkeypatch the release hook instead of method assignment mypy method-assign rejected the direct AsyncMock assignments; the prior static gate ran before this test file landed. * test(sandbox): guard envelope evidence for mypy in verb tests * chore(prompts): regenerate verb tables for request_sandbox * chore: resolve merge with master (breadcrumbs + statement budget) --------- Co-authored-by: Renn F <rennf93@users.noreply.github.com>
154 lines
9.4 KiB
Markdown
154 lines
9.4 KiB
Markdown
# Task Management Tools
|
|
|
|
There is **no** `roboco_task_*` tool surface. Tasks move through the lifecycle via **flow verbs** on the `roboco-flow` MCP server. Each verb is role-scoped — you only see the ones your role is allowed to call (the spawn manifest registers them per role). Every verb returns an **Envelope** whose `next` field tells you what to call next; trust it rather than guessing state.
|
|
|
|
The verbs below are grouped by who calls them.
|
|
|
|
## Developer flow
|
|
|
|
```python
|
|
give_me_work() # returns your most-actionable pending task
|
|
i_will_work_on(task_id, plan="...")
|
|
# claims + sets plan + starts; auto-creates and
|
|
# checks out feature/{team}/{task-hierarchy}
|
|
commit(message, files=None) # content tool — repeat per change (auto-pushed)
|
|
open_pr(task_id) # pushes branch + opens the PR
|
|
i_am_done(task_id, notes="") # verifying -> awaiting_qa (PR must already be open)
|
|
i_am_blocked(task_id, reason) # external dependency; cell PM unblocks
|
|
unclaim(task_id) # release a claimed task back to the queue
|
|
resume(task_id) # recover a paused task after compact/restart
|
|
i_am_idle() # no work in your queue right now
|
|
```
|
|
|
|
There is no separate claim / start / pause verb — `i_will_work_on` composes claim + set-plan + start atomically, and `i_am_done` composes verify + submit-qa. Branches are auto-created on `i_will_work_on`; do not checkout by hand.
|
|
|
|
## QA flow
|
|
|
|
```python
|
|
give_me_work() # returns an awaiting_qa task
|
|
claim_review(task_id) # claim for review (auto-checks-out dev branch)
|
|
pass_review(task_id, notes) # awaiting_qa -> awaiting_documentation
|
|
fail_review(task_id, issues=[...])
|
|
# awaiting_qa -> needs_revision (dev gets it back)
|
|
unclaim(task_id) / resume(task_id) / i_am_idle()
|
|
```
|
|
|
|
`notes` (on pass_review) and `issues` (on fail_review) must be substantive — the enforcement layer rejects empty or near-empty content. QA cannot review its own dev work (self-review guard rejects on `claim_review`).
|
|
|
|
## Documenter flow
|
|
|
|
```python
|
|
give_me_work() # returns an awaiting_documentation task
|
|
claim_doc_task(task_id) # claim the doc phase
|
|
commit(message, files) # commit the doc files you write
|
|
i_documented(task_id, notes, files)
|
|
# awaiting_documentation -> awaiting_pm_review
|
|
```
|
|
|
|
Documentation tasks are **not** delegated — the lifecycle auto-creates the doc phase after a code task passes QA.
|
|
|
|
## Cell PM flow
|
|
|
|
```python
|
|
triage() # list actionable tasks in your cell
|
|
i_will_plan(task_id, plan, approach)
|
|
# claim + plan + start a parent task
|
|
delegate(parent_task_id, title, description, assigned_to, team, task_type,
|
|
nature, estimated_complexity, acceptance_criteria,
|
|
covers_parent_criteria=[...])
|
|
# create a subtask; covers_parent_criteria maps
|
|
# it to the parent ACs it is responsible for
|
|
reassign(task_id, assigned_to) # move a subtask to a different agent
|
|
unblock(task_id, reason) # blocked -> in_progress (PM only); reason is
|
|
# recorded as your journal:decision (no separate
|
|
# note needed)
|
|
submit_up(task_id, notes) # open cell->root PR; -> awaiting_pr_review
|
|
# (the cell PR reviewer gates it; after pr_pass
|
|
# the same Cell PM completes + merges)
|
|
complete(task_id, notes) # awaiting_pm_review -> completed (merges leaf PR)
|
|
escalate_up(task_id, reason) # escalate to your escalation target
|
|
```
|
|
|
|
After `i_will_plan` and each `delegate`, the envelope includes a coverage view of the parent — `parent_ac_coverage` (per-criterion `id` / `text` / `claimed` / `verified`) and `unclaimed_parent_acs` (criteria no subtask covers yet). A parent cannot idle with unclaimed criteria, nor `complete` / `submit_up` / `escalate_to_ceo` until every criterion traces to a child that passed QA. These gates stay inert until you start declaring `covers_parent_criteria`. See `docs/rag/workflows/task-planning.md`.
|
|
|
|
**Delegation rules** (enforced): `main_pm -> cell_pm`; `cell_pm -> its team's devs`. Cell PMs receive planning-typed parent tasks; devs get code/research (UX devs also design). Always create subtasks via `delegate` with `parent_task_id` set — there is no standalone task-create verb for agents.
|
|
|
|
## Main PM flow
|
|
|
|
The Main PM shares most Cell PM verbs (`i_will_plan`, `delegate`, `complete`, `unblock`, `triage`, `escalate_up`), **adds** the verbs below, and — unlike a Cell PM — has **no** `submit_up` or `reassign`. Its bubble-up verb is `submit_root` (the root analogue of the Cell PM's `submit_up`):
|
|
|
|
```python
|
|
triage_all() # list actionable tasks across all teams
|
|
submit_root(task_id, notes) # open root->master PR; -> awaiting_pr_review
|
|
# (the main PR reviewer gates it; after pr_pass,
|
|
# complete escalates to the CEO)
|
|
escalate_to_ceo(task_id, reason)
|
|
# awaiting_pm_review -> awaiting_ceo_approval
|
|
give_me_work() # Main PM may also pull work directly
|
|
```
|
|
|
|
For a code root the Main PM **must** `submit_root` first — that opens the root→master PR and enters the in-path gate (`awaiting_pr_review`); only after the main reviewer `pr_pass`es it does `complete` escalate to the CEO. A branchless coordination root (product fan-out, no repo) skips the gate and is completed/escalated directly. The Main PM never merges to `master` — `complete` escalates and only the CEO merges the root→master PR.
|
|
|
|
## Board flow (Product Owner / Head of Marketing)
|
|
|
|
```python
|
|
triage() # list actionable tasks in scope
|
|
escalate_to_ceo(task_id, reason)
|
|
i_am_idle()
|
|
```
|
|
|
|
The Board **cannot** claim, create, complete, or cancel tasks. Strategic decisions are escalated to the CEO.
|
|
|
|
The Product Owner additionally has `propose_roadmap(cycle_goal, items)` — a **content tool** on `roboco-do`, not a flow verb, so it doesn't appear above. It authors the weekly board-roadmap-engine exploration cycle (a themed goal + 3-7 item drafts); the CEO approves or rejects each item individually into BACKLOG. See `docs/rag/roles/product-owner.md`.
|
|
|
|
## Auditor flow
|
|
|
|
```python
|
|
triage() # read-only list of actionable tasks
|
|
i_am_idle()
|
|
```
|
|
|
|
The Auditor is a silent observer: read-only `triage`, no `dm`/`notify`, no claim/complete/cancel.
|
|
|
|
## PR Reviewer flow
|
|
|
|
```python
|
|
give_me_work() # returns an inbound-PR review task
|
|
claim_pr_review(task_id) # claim it (planless, branchless — read-only)
|
|
post_pr_review(task_id, ...) # posts one change-request on the PR; task -> completed
|
|
unclaim(task_id) # release a claimed inbound or gate review back to the pool
|
|
i_am_idle()
|
|
```
|
|
|
|
The PR Reviewer reviews inbound external/fork (and, behind a flag, internal) PRs the org did not open. It is read-only: no `commit`/`open_pr`/`merge`, no `dm` — the change-request is posted server-side on the PR itself, and the CEO decides Supersede/Dismiss from the PR Review Queue.
|
|
|
|
The same role also runs the **in-path PR-review gate** on the org's own assembled delivery PRs — the merge-level review before the PM merges:
|
|
|
|
```python
|
|
claim_gate_review(task_id) # claim an awaiting_pr_review task; returns the assembled diff
|
|
pr_pass(task_id, notes) # assembled PR is correct -> awaiting_pm_review (the PM merges)
|
|
pr_fail(task_id, issues) # send it back -> needs_revision, like a QA fail
|
|
```
|
|
|
|
Both verdicts are also posted on the assembled PR itself as a GitHub review (server-side, bot account) so the decision is visible on the PR the PM merges: `pr_pass` → APPROVE, `pr_fail` → REQUEST_CHANGES — except the root→master PR, which only ever gets a plain COMMENT (only the CEO acts on `master`).
|
|
|
|
A cell reviewer (be/fe/ux-pr-reviewer) reviews its cell's assembled cell→root PR; `pr-reviewer-1` reviews the root→master PR for the cross-cell integration seam, before the CEO sees it.
|
|
|
|
## Cancel
|
|
|
|
Cancelling a task (any non-terminal status -> `cancelled`) is restricted to **PM roles and the CEO** — except `awaiting_ceo_approval -> cancelled`, which is **CEO-only** (a PM cancelling a task already in the CEO's queue would bypass the human approval gate). There is no agent verb to cancel — it is a PM/CEO operation through the lifecycle.
|
|
|
|
## Progress
|
|
|
|
Record progress against your plan with the `progress` content tool (on `roboco-do`), not a task verb:
|
|
|
|
```python
|
|
progress(task_id, message="API skeleton landed", plan_step="2")
|
|
```
|
|
|
|
Your plan's steps are the progress checklist; the percentage is derived from completed steps — you do not set it.
|
|
|
|
## Sandbox DB/Redis/Mongo (Developer + QA)
|
|
|
|
`request_sandbox(services=None)` — a **content tool** on `roboco-do`, not a flow verb — provisions a throwaway sandbox Postgres/Redis/Mongo on demand, for a project that opted in (`projects.sandbox_services`). Only `developer` and `qa` carry it. Omit `services` for the project's whole opted-in set; requesting one outside it is rejected naming the allowed set. Creds come back in the envelope's `evidence`, one entry per service, including ready-to-`export` `ROBOCO_TEST_*` values for gate tooling. Calling it again is a cheap no-op (same creds). See `docs/rag/architecture/sandbox-db.md`.
|