Files
SuperClaude/.claude/commands/deploy.md
NomenAK 219ff3905a feat: Optimize all 18 command files using @include reference system
Major streamlining achievement:
- Eliminate 2,733 lines of duplicate content across commands
- Reduce individual command files by ~70% (130-150 → 35-60 lines)
- Leverage existing shared/*.yml reference patterns
- Maintain full Claude Code compliance

Benefits:
• Single source of truth for universal content
• Guaranteed consistency across all commands
• Dramatically reduced maintenance overhead
• Massive token efficiency improvements

Implementation:
- Universal Legend: @include shared/universal-constants.yml#Universal Legend
- Universal Flags: @include shared/flag-inheritance.yml#Universal_Always
- Command patterns: References to appropriate shared/*.yml files
- Template system: Enhanced command-patterns.yml

🤖 Generated with [Claude Code](https://claude.ai/code)

Co-Authored-By: Claude <noreply@anthropic.com>
2025-06-24 22:46:52 +02:00

59 lines
2.1 KiB
Markdown

@include shared/universal-constants.yml#Universal_Legend
## Command Execution
@include shared/command-structure.yml#Base_Execution
@include shared/flag-inheritance.yml#Universal_Always
Deploy application to env specified in $ARGUMENTS.
Thinking flags (optional):
- --think→multi-service deployment coordination
- --think-hard→complex infrastructure & rollback planning
- --ultrathink→complete deployment architecture & disaster recovery
Examples:
- `/deploy --env staging --think` - Staging w/ coordination analysis
- `/deploy --env prod --think-hard` - Prod w/ comprehensive planning
- `/deploy --rollback --ultrathink` - Critical rollback w/ full impact analysis
Pre-deploy cleanup:
- Clean previous artifacts | Remove dev-only files (.env.local, debug cfgs)
- Validate prod cfg (no debug flags, correct URLs) | Clean old versions→free space
--env flag:
- dev: Deploy→dev env for testing | staging: Deploy→staging for pre-prod validation
- prod: Deploy→prod w/ all safety checks
--rollback flag:
- Revert→previous stable deployment | Maintain deployment history→audit trail
- Verify rollback success w/ health checks
Deployment workflow:
1. Validate→Check prerequisites & cfg 2. Build→Create artifacts 3. Test→Run smoke tests
4. Deploy→Execute strategy 5. Verify→Confirm health & functionality
Deployment strategies:
- Blue-green: Two envs, switch traffic→zero downtime | Canary: Gradual rollout→% users
- Rolling: Update instances sequentially w/ health checks
Pre-deployment checks:
- Verify tests pass | Check deployment cfg | Ensure rollback plan exists
- Validate env vars | Confirm DB migrations completed
Post-deployment:
- Run health checks & smoke tests | Monitor error rates & perf
- Check critical user journeys | Verify logging & monitoring | Ready→rollback if issues
## Safety & Best Practices
Safety:
- Always have rollback plan | Backups before deployment
- Monitor key metrics during deployment | Gradual rollout→major changes
@include shared/research-patterns.yml#Mandatory_Research_Flows
@include shared/user-experience.yml#Standard_Notifications
## Success Messages
@include shared/user-experience.yml#Success_Notifications