The agents' runtime KB had drifted three releases behind the gateway. Add the two missing role docs (prompter, secretary — both live-session SDK chat roles, human-only) and fold the AC/decomposition guardrails and per-dev code queues into the high-traffic PM docs: - task-model: acceptance_criteria_ids + parent_ac_refs fields and how the child->parent AC link works. - task-planning: covers_parent_criteria on delegate, the parent_ac_coverage / unclaimed_parent_acs briefing fields, the decomposition-floor and roll-up gates (safe-by-construction), and per-dev sequenced code queues. - task-tools: same coverage note + correct stale verbs — QA is pass_review/fail_review (not pass/fail), cell_pm gains reassign, and main_pm no longer claims submit_up/reassign it does not have.
5.9 KiB
Task Management Tools
There is no roboco_task_* tool surface. Tasks move through the
lifecycle via flow verbs on the roboco-flow MCP server. Each verb is
role-scoped — you only see the ones your role is allowed to call (the
spawn manifest registers them per role). Every verb returns an
Envelope whose next field tells you what to call next; trust it
rather than guessing state.
The verbs below are grouped by who calls them.
Developer flow
give_me_work() # returns your most-actionable pending task
i_will_work_on(task_id, plan="...")
# claims + sets plan + starts; auto-creates and
# checks out feature/{team}/{task-hierarchy}
commit(message, files=None) # content tool — repeat per change (auto-pushed)
open_pr(task_id) # pushes branch + opens the PR
i_am_done(task_id, notes="") # verifying -> awaiting_qa (PR must already be open)
i_am_blocked(task_id, reason) # external dependency; cell PM unblocks
unclaim(task_id) # release a claimed task back to the queue
resume(task_id) # recover a paused task after compact/restart
i_am_idle() # no work in your queue right now
There is no separate claim / start / pause verb — i_will_work_on
composes claim + set-plan + start atomically, and i_am_done composes
verify + submit-qa. Branches are auto-created on i_will_work_on; do not
checkout by hand.
QA flow
give_me_work() # returns an awaiting_qa task
claim_review(task_id) # claim for review (auto-checks-out dev branch)
pass_review(task_id, notes) # awaiting_qa -> awaiting_documentation
fail_review(task_id, issues=[...])
# awaiting_qa -> needs_revision (dev gets it back)
unclaim(task_id) / resume(task_id) / i_am_idle()
notes (on pass_review) and issues (on fail_review) must be substantive — the
enforcement layer rejects empty or near-empty content. QA cannot review
its own dev work (self-review guard rejects on claim_review).
Documenter flow
give_me_work() # returns an awaiting_documentation task
claim_doc_task(task_id) # claim the doc phase
commit(message, files) # commit the doc files you write
i_documented(task_id, notes, files)
# awaiting_documentation -> awaiting_pm_review
Documentation tasks are not delegated — the lifecycle auto-creates the doc phase after a code task passes QA.
Cell PM flow
triage() # list actionable tasks in your cell
i_will_plan(task_id, plan, approach)
# claim + plan + start a parent task
delegate(parent_task_id, title, description, assigned_to, team, task_type,
nature, estimated_complexity, acceptance_criteria,
covers_parent_criteria=[...])
# create a subtask; covers_parent_criteria maps
# it to the parent ACs it is responsible for
reassign(task_id, assigned_to) # move a subtask to a different agent
unblock(task_id) # blocked -> in_progress (PM only)
submit_up(task_id, notes) # open cell->root PR; -> awaiting_pm_review
complete(task_id, notes) # awaiting_pm_review -> completed (merges leaf PR)
escalate_up(task_id, reason) # escalate to your escalation target
After i_will_plan and each delegate, the envelope includes a coverage view
of the parent — parent_ac_coverage (per-criterion id / text / claimed /
verified) and unclaimed_parent_acs (criteria no subtask covers yet). A
parent cannot idle with unclaimed criteria, nor complete / submit_up /
escalate_to_ceo until every criterion traces to a child that passed QA. These
gates stay inert until you start declaring covers_parent_criteria. See
docs/rag/workflows/task-planning.md.
Delegation rules (enforced): main_pm -> cell_pm; cell_pm -> its team's devs. Cell PMs receive planning-typed parent tasks; devs get
code/research (UX devs also design). Always create subtasks via
delegate with parent_task_id set — there is no standalone task-create
verb for agents.
Main PM flow
The Main PM shares most Cell PM verbs (i_will_plan, delegate, complete,
unblock, triage, escalate_up), adds the two below, and — unlike a Cell
PM — has no submit_up or reassign (there is no PM above it to submit to;
it completes or escalates the root directly):
triage_all() # list actionable tasks across all teams
escalate_to_ceo(task_id, reason)
# awaiting_pm_review -> awaiting_ceo_approval
give_me_work() # Main PM may also pull work directly
complete for the Main PM merges the root PR. Only the CEO merges to
master; agents stop at escalate_to_ceo.
Board flow (Product Owner / Head of Marketing)
triage() # list actionable tasks in scope
escalate_to_ceo(task_id, reason)
i_am_idle()
The Board cannot claim, create, complete, or cancel tasks. Strategic decisions are escalated to the CEO.
Auditor flow
triage() # read-only list of actionable tasks
i_am_idle()
The Auditor is a silent observer: read-only triage, no say/dm/
notify, no claim/complete/cancel.
Cancel
Cancelling a task (any non-terminal status -> cancelled) is restricted
to PM roles and the CEO. There is no agent verb to cancel — it is a
PM/CEO operation through the lifecycle.
Progress
Record progress against your plan with the progress content tool (on
roboco-do), not a task verb:
progress(task_id, message="API skeleton landed", plan_step="2")
Your plan's steps are the progress checklist; the percentage is derived from completed steps — you do not set it.