mirror of
https://github.com/rennf93/roboco.git
synced 2026-08-03 07:23:24 +02:00
[sweep] strip Fxxx audit-ID tokens + trim bloated comments/docstrings + add behavior-change docs
Post-audit sweep over the 135 audit-fix commits since19a474d3: 1. Stripped every # Fxxx: audit-ID token from comments AND every Fxxx token from docstring openings across 211 blocks / ~626 lines. The CEO flagged these twice: audit-issue IDs in code confuse future devs/agents. The descriptive text is preserved; only the Fxxx token is removed (and bloated narrative blocks trimmed to 1-3 lines keeping the one non-obvious invariant). 2. Trimmed bloated comments/docstrings to the concise standard (1-3 lines). 3. Added missing behavior-change docs for the audit-fix batch: prompts/roles (documenter, pr_reviewer, qa), user-facing docs (api auth, websockets, agent-gateway, megatask, merge-model, task-lifecycle, grok, resilience, conventions, panel, security, troubleshooting), and the RAG corpus (cell-pm, main-pm, pr-reviewer, qa roles; conventions; messaging-tools; escalation; megatask; task-claiming workflows). Comment/docstring/prose ONLY — zero code-line edits (verified: the diff contains no def/class/return/if/for/await/assignment/call lines). Gates green: ruff format + ruff check clean, mypy clean on roboco/. The only pytest failures are the pre-existing sync_branch tracing-decision gap (B1,250be5c2) — not sweep-caused and tracked separately.
This commit is contained in:
@@ -14,7 +14,7 @@ Hierarchy: Umbrella (Main PM) → Root-subtasks (Main PM) → Cell tasks (cell P
|
||||
- The umbrella does **no git**. It is exempt from the branch gate (it reaches `in_progress` with no branch) and you must **not** call `submit_root` on it — it assembles no PR. Each root-subtask opens and is reviewed on its own PR.
|
||||
- The umbrella **completes** only when every root-subtask is terminal; then it escalates to the CEO (PR requirement waived).
|
||||
- The root-subtasks are sequenced: a wave's tasks dispatch only once the previous wave's tasks reach a terminal state (ordinary dependency-gating). You do not reorder them — the analyzer set the order at create time.
|
||||
- On the Board route the root-subtasks are held in `backlog` until the CEO approves the umbrella, then released to `pending`. On the Approve & Start route they start immediately.
|
||||
- On the Board route the root-subtasks are held in `backlog` until the CEO approves the umbrella, then released to `pending`. On the Approve & Start route they start immediately. On Board-route activation a `code`-typed root-subtask is **retyped to `planning`** — a Main PM never owns a `code` task (the `main_pm + code` combo is the 2026-06-27 meltdown trigger).
|
||||
|
||||
## For the Main PM
|
||||
|
||||
|
||||
Reference in New Issue
Block a user