[sweep] strip Fxxx audit-ID tokens + trim bloated comments/docstrings + add behavior-change docs
Post-audit sweep over the 135 audit-fix commits since19a474d3: 1. Stripped every # Fxxx: audit-ID token from comments AND every Fxxx token from docstring openings across 211 blocks / ~626 lines. The CEO flagged these twice: audit-issue IDs in code confuse future devs/agents. The descriptive text is preserved; only the Fxxx token is removed (and bloated narrative blocks trimmed to 1-3 lines keeping the one non-obvious invariant). 2. Trimmed bloated comments/docstrings to the concise standard (1-3 lines). 3. Added missing behavior-change docs for the audit-fix batch: prompts/roles (documenter, pr_reviewer, qa), user-facing docs (api auth, websockets, agent-gateway, megatask, merge-model, task-lifecycle, grok, resilience, conventions, panel, security, troubleshooting), and the RAG corpus (cell-pm, main-pm, pr-reviewer, qa roles; conventions; messaging-tools; escalation; megatask; task-claiming workflows). Comment/docstring/prose ONLY — zero code-line edits (verified: the diff contains no def/class/return/if/for/await/assignment/call lines). Gates green: ruff format + ruff check clean, mypy clean on roboco/. The only pytest failures are the pre-existing sync_branch tracing-decision gap (B1,250be5c2) — not sweep-caused and tracked separately.
This commit is contained in:
@@ -17,8 +17,8 @@ Two more read-only servers give agents a read-only view of git (`status`, `log`,
|
||||
|
||||
At spawn, every agent is handed a **manifest** listing exactly the verbs its role may call — and nothing else. The manifest is built from a server-side role configuration and mounted read-only into the container. The result is that the lifecycle's role rules aren't just policy, they're *unreachable code* for the wrong role:
|
||||
|
||||
- A **developer** can `give_me_work`, open a PR, and mark itself done — but there is no merge verb in its manifest.
|
||||
- **QA** can claim a review and pass or fail it — but it has no `commit`.
|
||||
- A **developer** can `give_me_work`, open a PR, mark itself done, and `sync_branch` (rebase its branch onto its base through the gate) — but there is no merge verb in its manifest.
|
||||
- **QA** can claim a review and pass or fail it — but it has no `commit`. QA and Documenters also get `i_am_blocked` as their escape hatch when they're stuck.
|
||||
- A **PR reviewer** can pass or fail an assembled PR and post its review on the PR — but it never gets agent chat verbs.
|
||||
- The **Auditor** is restricted to leaving a private note and reading evidence; it cannot `say` or `dm`. It observes; it does not participate.
|
||||
|
||||
@@ -38,6 +38,9 @@ That `next` / `remediate` contract is why agents move through the lifecycle reli
|
||||
A few more protections run by construction, the same way on every backend (Claude or Grok):
|
||||
|
||||
- **Claim-locking** serializes work, so two agents can't grab the same task or race a merge.
|
||||
- **Content posts require an active claim.** `commit`, `note`, `say`, `dm`, and `evidence` on a specific task are refused unless the agent holds that task's active claim — an agent can't write to a task it hasn't locked.
|
||||
- **Human-only roles are never spawned.** The CEO, the Intake (prompter), and the Secretary are human-driven, so `spawn_agent` structurally refuses them — a notification addressed to the CEO can never launch a CEO container that acts as the human. Intake and Secretary run through their own dedicated, guarded chat paths instead.
|
||||
- **Notifications can't target human-only roles.** `notify` rejects the CEO/prompter/secretary as recipients — there is no agent acknowledgement path for them, so a notification to them is a no-op rather than a stuck ack.
|
||||
- **The token never enters the container.** Your GitHub PAT is injected only for the moment of a git operation, orchestrator-side, and scrubbed from every clone — see [Register a project](../get-started/first-project.md#what-happens-under-the-hood).
|
||||
- **A prompt-injection guard** screens task prompts, and a bash guard blocks credential-exfiltration and identity-forgery patterns.
|
||||
- **Rate limits and overloads park, they don't crash-loop.** If a provider returns a 429 or a persistent overload, RoboCo *queues* that agent's work and probes for recovery instead of burning tokens retrying. You'll see an amber banner; the work resumes automatically when the provider does.
|
||||
|
||||
@@ -25,6 +25,8 @@ For each task it proposes, the agent declares a small **collision surface**: whi
|
||||
|
||||
The waves are just ordinary task dependencies, so the same dependency-gate that already paces the rest of the company runs them: a wave starts only once the previous wave's tasks have reached a terminal state — normally each one's pull request is merged (a cancelled task releases the next wave too).
|
||||
|
||||
The same collision-aware sequencing follows the work **down the chain**, not just at the top level. When a cell PM delegates a root-subtask into developer tasks, the dev-task collision surfaces flow through the same DAG — file-overlap serializes, migration-adders chain, shared-surface edits wait their turn — and cell tasks themselves wave-chain off their sibling root-subtasks. So a batch that spans a shared codebase stays ordered all the way to the leaves, not only at the umbrella. The task hierarchy is capped at four layers (umbrella → root → cell → dev) to fit this MegaTask shape.
|
||||
|
||||
## What gets created
|
||||
|
||||
When you confirm, RoboCo creates one **umbrella** task that groups the batch, and one **root-subtask** per piece of work:
|
||||
|
||||
@@ -40,6 +40,15 @@ graph BT
|
||||
|
||||
Each of those assembled pull requests passes through the [in-path PR-review gate](task-lifecycle.md#the-in-path-pr-review-gate) before its PM merges it.
|
||||
|
||||
## Submit gates that keep the chain clean
|
||||
|
||||
Two gate-level checks stop a stale branch from sneaking through:
|
||||
|
||||
- **Behind-base gate on `i_am_done`.** If a sibling's PR merged into the parent branch while the developer worked, the dev's branch is now behind its base and the assembled PR won't merge cleanly. The gate refuses `i_am_done` in that state and steers the developer to `sync_branch` — the gate-level rebase verb that rebases the branch onto its base (raw shell git is denied to agents, so the rebase goes through the gate, traced and evidenced). Conflicts abort with no force-push and point the dev at resolve-by-hand. The gate fails open on a flaky fetch so a transient git error can't strand a task at the submit gate.
|
||||
- **Unchanged-PR gate on `submit_root`.** When a Main-PM root PR is `pr_fail`'d and re-submitted byte-identical, the loop would repeat forever. The gate refuses the re-submit when the assembled root PR's head SHA is unchanged since the last `pr_fail` (no new cell work → identical diff); a different SHA means the branch advanced and the submit proceeds. Every ambiguous case fails open.
|
||||
|
||||
PR operations are also **scoped per project** — `open_pr`, `pr_target`, `close_pull_request`, and `merge_pr` all require the project and resolve the PR number within it, so two tasks in different repos that happen to share a PR number can never collide and merge the wrong repository's PR.
|
||||
|
||||
## Only the CEO merges to master
|
||||
|
||||
The final pull request — root → master — is the one place the company stops and hands the decision back to you. It lands in your **CEO Approval Queue** and waits.
|
||||
|
||||
@@ -54,6 +54,8 @@ stateDiagram-v2
|
||||
|
||||
Rejection isn't a dead end — it's a loop. When **QA fails** a task, or a **PR reviewer rejects** an assembled pull request, the task drops back to `needs_revision`, the developer reworks it, and it re-enters the flow. The same is true when *you* request changes from the CEO Approval Queue. Nothing is lost; the task carries its history, branch, and pull request with it the whole way around.
|
||||
|
||||
A failed developer task is routed back to **the developer who worked it** (resolved from the work session), not the pool — so the revision lands with whoever has the context, rather than being re-claimed cold by a cell PM. Only a task no developer ever touched falls back to the pool.
|
||||
|
||||
## The in-path PR-review gate
|
||||
|
||||
Most leaf developer tasks are reviewed by QA and never need a separate PR review. But when work is **assembled and pushed up the chain as a pull request**, it stops for a dedicated review before any PM merges it:
|
||||
@@ -81,6 +83,7 @@ Transitions aren't suggestions; they're enforced. A handful of the rules:
|
||||
- **`pr_pass` / `pr_fail`** are PR-reviewer-only.
|
||||
- **Merging** (`awaiting_pm_review → completed`) is PM-only; **escalating to the CEO** and the final **approve / request-changes / cancel** are CEO-only.
|
||||
- **Cancelling** is PM-only.
|
||||
- **A Main-PM coordination root can never be `task_type=code`.** The Main PM coordinates; it doesn't write code itself, so the combination is rejected at creation — a structural guard, not a hint.
|
||||
|
||||
How those role boundaries are enforced — and why a developer literally cannot call the merge verb — is the subject of [How agents are sandboxed](agent-gateway.md).
|
||||
|
||||
|
||||