mirror of
https://github.com/rennf93/roboco.git
synced 2026-08-03 07:23:24 +02:00
Chore: v1 removal gateway canonical (#46)
* chore(agent_sdk): remove dead /traceability/remind endpoint and reminder map
The TRACEABILITY_REMINDERS dict and its /traceability/remind endpoint were
keyed entirely on pre-gateway tool names (roboco_task_*, roboco_journal_*,
roboco_message_send, roboco_session_create_for_tasks) deleted in the gateway
cutover. The endpoint had zero callers; v2 enforces traceability server-side
in the Choreographer.
* fix(bootstrap,seeds): onboarding prompts call give_me_work(), not deleted roboco_task_scan()
The startup prompt and the seeded cell/all-hands channel onboarding messages
instructed agents to call roboco_task_scan() — a tool removed in the gateway
cutover. Point them at the live give_me_work() flow verb.
* fix: replace remaining deleted v1 tool names with gateway verbs
Spawn prompts, onboarding strings, remediation messages, and comments still
referenced pre-gateway tools deleted in the cutover (roboco_task_*,
roboco_agent_idle, roboco_notify_*, roboco_message_send,
roboco_session_create_for_tasks, roboco_journal_*, roboco_escalate). Rewrote
each to the correct role-scoped gateway verb (give_me_work/i_will_work_on for
workers, triage for PMs, i_am_done vs complete, notify/notify_ack, escalate_up,
unclaim, i_documented, open_session, note). Updated one enforcement-message
test that matched the old tool name by coincidence.
* test: guard against deleted v1 tool names reappearing in roboco/
Scans roboco/ for the deleted pre-gateway tool names; excludes the orphaned
roboco/agents/ subtree (removed in a later phase).
* chore(exceptions): drop 8 unused pre-gateway exception classes + their tests
LLMError, RAGError, AlreadyExistsError, TaskBlockedError, TaskClaimError,
AgentNotAvailableError, AgentBusyError, NotificationPermissionError were never
raised in production. SessionClosedError/DatabaseError are kept (live + tested).
* chore(models): drop unused pre-gateway notification/channel/handoff factories
Removes create_task_assignment/_blocker_escalation/_review_request/
_documentation_request/_priority_change/_alert/_broadcast, create_cell_channel/
_cross_cell_channel/_announcements_channel, create_handoff (+ HandoffParams),
ProactiveContext, and A2APartType. The gateway choreographer builds these
server-side now. Drops the matching dead-code tests.
* chore(services): drop unused pre-gateway permission/messaging/audit/optimal/remediation methods
These pre-gateway helpers (channel-permission checks, channel-membership ops,
permission-denial audit hooks, doc ingestion, two remediation hints) have no
production caller — the gateway role_config + enforcement layer replaced them.
Drops the matching dead-code tests; live methods (send_message, the SESSION_*
flow, log_task_action_denial, etc.) are untouched.
* chore(orchestrator,ws,events,config): drop unused pre-gateway lifecycle/broadcast/roster symbols
orchestrator: get_running_agents, is_agent_busy, queue_priority_work,
get_all_instances (+ their OrchestratorAccessProtocol declarations in events.py).
websocket: broadcast_new_message, broadcast_session_closed (no event type emits
them). agents_config: ALL_PMS/ALL_DEVS/ALL_QA/CELL_PMS roster constants (ALL_DOCS
stays — it gates docs-write workspace perms).
* refactor(agents): delete orphaned pre-gateway agent subtree + dead organization model
The Gateway/full cutover replaced the Python agent-class implementations with
the server-side Choreographer; the classes survived only as a self-referential
island. Removes roboco/agents/{base,mixins,factory,board,developer,documenter,
pm,qa,orchestrator}.py and roboco/agents/factories/{board,cells,developers,
documenters,pms,qa}.py, plus roboco/models/organization.py (Cell/Board/
Organization — used only by those factories). Keeps factories/_base.py
(compose_prompt — the live prompt-layer composer the orchestrator calls at
spawn) behind minimal package __init__ files.
* chore(db): drop dead tasks.execution_log + outputs columns (migration 015)
Both JSON columns had zero readers/writers in code, tests, and migrations —
execution progress is tracked via progress_updates and artifacts via
commits/documents. Removes the ORM columns, the Pydantic Task.execution_log/
outputs fields, the ExecutionLog/FileRef models (+ their __init__ exports), and
the now-invalid kwargs from test fixtures. Migration 015 (down_revision
014_drop_pm_approvals) verified live: upgrade drops, downgrade re-adds.
Apply on the NAS with 'alembic upgrade head' at next deploy.
* chore(config): drop 16 unread Settings fields
Verified unused (no settings.X, no self.X property use, no getattr-by-name):
app_name, reload, workers, openai_api_key, secret_key, access_token_expire_minutes,
algorithm, log_level, log_format, the four session_* limits, message_max_length,
commit_subject_min_chars, commit_banned_words, agent_budget_sweep_interval_seconds.
Removes the empty Logging + Sessions&Messages sections and orphaned .env.example
vars. Kept: redis_db/redis_password (redis_url property), agent_sla_* (read via
getattr in task_lifecycle), encryption_key, and all live thresholds.
NOTE: commit_banned_words/commit_subject_min_chars and
agent_budget_sweep_interval_seconds were feature-config never wired to their
consumer (commit validator / budget sweep) — removed as dead, but flagged in
case the intent was to wire them.
* test(lifecycle): give i_will_work_on calls a substantive plan (#171 contract)
The real-DB lifecycle tests called i_will_work_on with a 13-char plan and no
risks/technical_considerations, so the substantive-plan gate (#171) rejected
them with incomplete_input — failing on master. Supply a >=150-char plan plus
technical_considerations and risks (mirroring tests/unit/gateway/
test_choreographer_dev.py). All 6 now pass; gate runs with no deselect.
* feat(gateway): wire commit-validator thresholds to settings
commit_subject_min_chars and commit_banned_words were config defined but never
read — the gateway commit() gate used the validator's hardcoded module defaults.
Re-add the two Settings fields and pass them through validate_commit_message in
content_actions.commit(), so config is the source of truth (validator defaults
remain the standalone/CI fallback). Adds wiring tests that monkeypatch settings
and assert the gate honors them.
* refactor(orchestrator): retire gateway_enabled flag; trigger_filter is unconditional
The gateway_enabled Settings field gated only the trigger_filter spawn-cooldown
(never the agent tool surface). Prod ran it on; the Phase-0 'legacy dispatch
path' it guarded no longer exists. Remove the field + the early-return branch in
gateway_pre_spawn_check so the cooldown runs for every spawn, drop the now-dead
ROBOCO_GATEWAY_ENABLED from docker-compose.yml, and update the stale Phase-0
comments + cooldown test. The per-container ROBOCO_GATEWAY_ENABLED env (set by
_append_manifest_args, read by agent_sdk to load the manifest) is unaffected.
* refactor(api): relabel /api/v2 -> /api/v1 as the canonical gateway surface
The gateway is the only agent API now, so the 'v2' label (with no v1) was
misleading. Renames roboco/api/routes/v2 -> routes/v1, schemas/v2 -> schemas/v1
(+ the matching test dirs and test_v2_role_dep/test_schemas_v2_flow files),
rewrites every /api/v2 path, routes.v2/schemas.v2 import, and v2-* router tag to
v1, and refreshes the stale 'v2' comments/docstrings. The panel is untouched (it
uses the unversioned /api/* REST routes). flow_server/do_server now POST to
/api/v1/*.
* docs(scripts): reset_runtime_state header matches actual SQL behavior
The header claimed it preserves groups + journals, but the .sql wipes both
(verified live: groups 6->0, journals 5->0; only agents/projects/channels
survive). Correct the wiped/preserved lists to match.
* refactor(gateway): extract _build_rich_plan to drop i_will_work_on under the complexity gate
i_will_work_on was cyclomatic rank C (11) — one over the xenon --max-absolute B
threshold — because of the five `x or default` fallbacks in the rich_plan dict.
Move that dict into a small _build_rich_plan helper (behaviour identical); both
methods are now rank B. make quality is fully green (xenon was its last failure;
bandit already passed — its 34 findings are all LOW severity, filtered by -ll).
* feat(foundation): add canonical CELL_TEAMS set; dedupe cell-subset literals
* feat(db): add ProductTable + ProductProjectTable ORM (per-cell project map)
* feat(task): add additive nullable product_id (ORM + model + DTO + create threading)
* feat(task): thread product_id through create_subtask/route/response
* feat(db): migration 016 — products, product_projects, tasks.product_id
* fix(db): document migration 016 plan deviations (revision len, FK name)
Two values in migration 016 intentionally diverge from the Task 2.4 plan
literals; this strengthens the in-file justification so the deviations are
self-documenting and verifiable.
- revision id (plan line 623): the plan's 36-char
"016_add_products_and_task_product_id" overflows alembic_version.version_num
(VARCHAR(32)) — alembic upgrade head raises asyncpg
StringDataRightTruncationError. Kept at 27 chars
("016_add_products_product_id") so Step 4's live round-trip stays green.
- downgrade FK name (plan line 683): roboco/db/base.py sets a metadata
naming_convention, so the FK upgrade() creates is
"fk_tasks_product_id_products", not the Postgres default
"tasks_product_id_fkey". The plan literal does not exist in the DB and
would fail the downgrade with "constraint does not exist".
Both verified via the live upgrade/downgrade round-trip on a throwaway DB.
Issue 3 note: the prior commit (b896cac) also touched
tests/unit/api/test_schemas_tasks.py (added product_id=None to the
task_to_response stub). That line is load-bearing — task_to_response reads
task.product_id (added in Task 2.3, commit 67afa6b) — and belongs to Task 2.3's
scope; it is left in place because removing it breaks 4 tests and history is
not rewritten.
* refactor(db): trim migration 016 deviation notes to plan-faithful form
Reverts the out-of-scope documentation expansion (commit 1a4f296), which
was a second undocumented commit beyond Task 2.4's single plan-specified
commit and only bloated the migration docstring/comments.
The migration file now matches the plan-specified commit (b896cac) byte for
byte: the two necessary deviations from the plan literals stay (revision id
shortened to fit alembic_version.version_num VARCHAR(32); downgrade FK name
follows db/base.py's metadata naming_convention), each kept to a concise
inline note in the plan's header style.
The Task 2.3-scoped test stub line (tests/unit/api/test_schemas_tasks.py
product_id=None) is load-bearing — task_to_response reads task.product_id —
and is left in place; history is not rewritten.
Verified: live alembic upgrade head + downgrade to 015 round-trip on a
throwaway DB drops products/product_projects/tasks.product_id cleanly, and
make quality is green.
* refactor(test): annotate db_session and drop type: ignore in migration 016 test
Annotate the test_products_tables_and_task_fk_exist param as
db_session: AsyncSession (imported under TYPE_CHECKING) and remove the
# type: ignore[no-untyped-def] suppression, matching the typed db_session
pattern used across tests/integration/.
* feat(models): Product + ProductCreate/Update + ProductCellMapping (cell-validated)
* refactor(models): minimize ProductCellMapping config override to use_enum_values
The previous override re-declared validate_assignment, populate_by_name,
and extra=forbid, which RobocoBase already supplies. Pydantic merges
model_config across inheritance, so overriding only use_enum_values=False
is sufficient to keep team as a real Team enum (required so team in
CELL_TEAMS and enum identity hold for callers) while inheriting the rest
of the base config.
* fix(models): document ProductCellMapping use_enum_values override as plan-mandated
Resolves SPEC-COMPLIANCE review notes for Task 3.1 (Product domain models).
1. The ProductCellMapping use_enum_values=False override is a deviation from a
bare project.py mirror, but it is mandated by the plan's own Task 3.1 code:
RobocoBase sets use_enum_values=True, which coerces team to the plain string
"backend". The plan's Step 1 test asserts m.team is Team.BACKEND (enum
identity) and the Step 3 validator formats its error with v.value, both of
which require team to remain a real Team enum. The override is therefore
necessary; this commit relabels the comment to cite the specific spec lines
that force it instead of leaving it as an unexplained departure. Downstream
Task 3.2 (_replace_cells / project_for) already tolerates either form and the
ORM stores the same value regardless, so the override has no behavioral reach
beyond the in-memory enum identity the plan's test checks.
2. test_product_model.py hoists 'from uuid import uuid4' to module level rather
than inline (as the plan's verbatim Step 1 code shows) because the global
Pylint PLC0415 rule (import-outside-top-level) forbids inline imports and
there is no per-file-ignore for tests/unit/models/. The hoisted form is the
only ruff-clean rendering of the plan's test; left unchanged here.
3. Task 3.1 landed across two commits (c616d95 create, 6ebad255 refactor) rather
than the plan's single Step 5 commit. Earlier history is intentionally not
rewritten; this single follow-up commit brings the model to its final
spec-faithful, fully-documented state.
* feat(service): ProductService CRUD + project_for per-cell resolver
* feat(api): Product CRUD routes + schemas, wired into the app
* fix(api): roll back and map cell-replacement IntegrityError on product update
update_product replaced cells via ProductService._replace_cells without
any try/except, so a duplicate-team cell (uq_product_projects_product_team)
or a non-existent project_id (product_projects.project_id FK) raised an
IntegrityError at flush, poisoning the AsyncSession and surfacing an
unhandled 500 with no rollback. Wrap the update + commit in a try/except
that rolls back and maps the UNIQUE violation to 409 and the FK violation
to 422, mirroring create_product's rollback discipline. Add integration
tests covering both client-error paths.
* fix(api): map create_product cell-mapping IntegrityError to 409/422
create_product only caught the slug conflict ('already exists' in str(e))
and bare-raised everything else, so a cells entry whose project_id does not
reference any project let the product_projects.project_id FK IntegrityError
propagate out of the route as an unhandled 500. The matching update_product
path was already hardened (uq_product_projects_product_team -> 409, FK
violation -> 422); apply the same mapping in create_product so a bad
project_id (or a duplicate-team cell) is a client error, not a server error.
The slug conflict is now caught as ConflictError directly instead of via a
broad except + string match.
* feat(gateway): add optional project_id to delegate inputs/request/routes
* feat(gateway): per-cell project routing (override -> product map -> parent) + product_id inheritance
* feat(task): approve_and_start — reassign board task to Main PM (CEO gate #1)
* feat(api): POST /tasks/{id}/approve-and-start (CEO gate #1, notes-required)
* test(api): cover approve-and-start 404-before-notes-gate for missing task
* feat(panel): Product types + Task.product_id
* feat(panel): productsApi + hooks + tasksApi.approveAndStart
* feat(panel): Products management screen + sidebar nav
* feat(panel): Approve & Start button (CEO gate #1)
* fix(api): narrow delete_product to IntegrityError + cover 204/409 delete paths
* test(task): assert approve_and_start persists + appends the audit note
* refactor(db): migration 016 names the tasks.product_id FK explicitly (house style)
* fix(db): make migrations authoritative + self-heal orphan product tables
init_db() no longer silently falls back to create_all when alembic upgrade
fails. That fallback masked migration failures and, since create_all cannot
ALTER an existing table, left the schema inconsistent — turning an unapplied
migration 016 into a crash loop: 016's CREATE TABLE products failed, the
upgrade rolled back, create_all re-created an empty orphan products table, and
every later boot failed again on the now-existing table while tasks.product_id
never got added. Now a migration failure is raised so the real error surfaces.
Migration 016 additionally drops EMPTY orphan products/product_projects tables
left by the old fallback before creating them, so an already-polluted DB
self-heals on the next deploy with no manual SQL. Skipped in offline (--sql)
mode; refuses to drop a table that holds rows.
* fix(db): create_all is the schema source of truth; alembic for increments
The Alembic chain is incomplete relative to the ORM — columns/tables like
notifications.delivered_at and the RAG indexed_documents table have NO migration
and have only ever been materialized by create_all. Tests don't catch this
because the test DB is also built via create_all, so migrations are never
exercised. The prior 'migrations are authoritative' init_db (and before it, the
create_all-only-on-failure fallback) therefore left a migrate-only boot with
missing columns/tables.
init_db now reflects reality:
- Fresh DB -> create_all builds the full current ORM schema, then stamp
Alembic at head so later incremental migrations apply.
- Existing -> run pending migrations (a real failure is raised, not masked),
then create_all(checkfirst) to gap-fill any missing ORM tables.
create_all cannot add a column to an existing table, so an ORM column added
without a migration needs a fresh rebuild of that table to appear.
* fix(db): migration 017 reconciles the Alembic chain with the full ORM schema
For years the live schema was built by create_all, not migrations, so the chain
drifted — tables/columns/indexes in the ORM had no migration (the
indexed_documents table, notifications.delivered_at, ~15 indexes, plus
timestamptz/server-default metadata). With init_db no longer masking that via a
create_all fallback, a migrate-only boot was missing those objects.
017 was produced by 'alembic revision --autogenerate' against Base.metadata,
reviewed, and verified: on a fresh DB, 'alembic upgrade head' (001..017) now
reproduces the create_all schema EXACTLY — a re-run of autogenerate detects zero
changes — and the 017 upgrade/downgrade round-trips cleanly. The migration chain
is now complete: migrate-only and create_all converge.
Also updates the init_db tests to assert the new behaviour (raise on an existing
DB's migration failure; create_all + stamp head on a fresh DB) instead of the
removed silent fallback.
* feat(panel): Product picker in the New Task form (drives per-cell routing)
The Products screen and Approve & Start button shipped, but the task-creation
form had no way to attach a Product — so a human couldn't set product_id from
the UI, which is exactly what drives per-cell project routing of delegated
subtasks. Adds an optional Product dropdown (Advanced -> Git config) populated
from useProducts(); 'None' falls back to the single project.
* fix(db): seed data is preserved on a fresh DB (run migrations, not bare create_all)
The previous fresh-DB path (create_all + stamp head) built the tables but never
ran the migration chain, so migration-embedded SEED DATA was skipped — most
visibly the AI providers seeded in 004. After a DB reset that left
provider_configs empty, so PUT /api/providers/ollama-key 404'd (the handler
raises NotFoundError when the Ollama provider row is missing).
Since migration 017 made the chain reproduce the full ORM schema, init_db now
runs 'alembic upgrade head' from base on a fresh DB — building every
table/column/index AND running the seeds. Verified: a fresh upgrade head seeds
both provider rows. Existing DBs still get migrations + create_all gap-fill.
Updates the init_db fresh-DB test accordingly.
* feat(task): project_id optional when a product_id is set (board fan-out tasks)
A board task that fans out across cells via a Product has no single repo of its
own — backend/frontend/ux_ui are each wrong, because the root coordinates and
delegates. Forcing one arbitrary Project was broken design (flagged at design
time). project_id is now nullable; a task must have project_id OR product_id:
- TaskCreate model validator + a TaskService.create() invariant (covers every
create path).
- ORM/DTO/schema: project_id nullable; task_to_response uses to_python_uuid.
- Gateway: a parent with only a product can delegate (guard now needs BOTH
project and product to be None to reject); _resolve_subtask_project resolves
each subtask from the product map and raises a clear error if a cell has no
mapping and no parent project.
- Migration 018 (tasks.project_id nullable), round-trip verified; fresh
upgrade head still seeds providers.
- Panel: Project no longer required once a Product is selected.
- Removed the dead, never-called a2a create_task_from_message (it could only
ever create a repo-less task) + its two coverage-only tests.
make quality green; panel tsc/lint/build green.
* Upgrade to Minimax M3
* fix(db): seed providers on existing DBs + correct enum casing
Migration 004 created the modelprovider/assignmentscope enums and seeded
provider rows in UPPERCASE, but the ORM (_str_enum) reads/writes the
lowercase StrEnum .value — so a fresh migrate-from-base DB built an enum
the ORM cannot read. Lowercase the enum labels and seed values in 004.
Add idempotent migration 019 to (re)seed the Anthropic + Ollama Cloud
providers with ON CONFLICT (name) DO NOTHING, so an existing DB whose
provider_configs table was created by create_all (and never ran 004's
seed) gets the rows on the next `alembic upgrade head` — fixing the
/api/providers/ollama-key 404 without a volume wipe.
* fix(tasks): let board/fan-out coordination tasks flow without a repo
A coordination task (project_id NULL, product_id set) targets no repo of
its own — it fans out to cell subtasks that each resolve a real project
from the product's cell->project map. Several paths still assumed every
task does git work and blocked it:
- orchestrator: add _is_coordination_task() and exempt these tasks from
the project/branch/git-token gates in _readiness_check_task,
_readiness_gate, _check_stuck_conditions, _validate_task_for_spawn.
- services/task.py: _ensure_branch_for_task returns "" (no branch) for a
coordination task instead of raising; activate requires project OR
product. This unblocks Main PM's i_will_plan claim, which otherwise
raised before it could delegate the fan-out.
- gateway: _pending_assignment_guard exempts advisory roles
(product_owner/head_marketing/auditor) from the "assigned but never
claimed" idle gate — they review without claiming, so they could not
satisfy a claim-or-unclaim remediation.
Adds focused unit tests for each.
* fix(tasks): coordination tasks reach in_progress + team reflects Main PM
The board->cells fan-out deadlocked: a coordination/fan-out task (product set,
no project of its own) could be created and claimed, but start()'s
claimed->in_progress transition hit validate_git_requirements, which still
demanded a branch_name and raised GitRequirementError. So Main PM's i_will_plan
never completed — it looped and never delegated. c961282 exempted
_ensure_branch_for_task (branch creation) but missed this parallel git gate in
the enforcement layer.
- task_lifecycle.py: add GitContext.is_coordination; skip the
claimed->in_progress branch_name gate when it is set.
- task.py: populate is_coordination=(project_id is None and product_id is not
None) in _validate_and_set_status; a branchless code task is still gated.
- approve_and_start: set team=Team.MAIN_PM on hand-off so the task isn't left
labelled team=board after it leaves the board (now assigned to main-pm).
Adds a lifecycle-gate unit test and an end-to-end integration test that
claims, plans, and starts a project-less coordination task.
* fix(hooks): remove dead traceability hook + stale deleted-verb references
The v1-removal cleanup (2cfbf39) deleted the /traceability/remind SDK endpoint
but left the PostToolUse hook that curls it, so every gateway tool call 404'd
and agents silently lost their traceability reminders. Remove the dangling hook
(registration + TRACEABILITY_TRIGGER_TOOLS + Dockerfile COPY + the script); v2
carries per-verb guidance on the Envelope. Also correct two stale pre-gateway
tool names in hook text: the budget loop-detector nudged agents toward the
deleted roboco_task_escalate() (now unclaim()/i_am_idle(), which every looping
role has), and an sdk-startup comment referenced roboco_task_scan/get.
Extends the deleted-tool-name guard to scan docker/scripts/*.sh and to assert
every $SDK_URL/<path> a hook curls is a route still served by the SDK — the
check that would have caught this class (it lives in shell, invisible to mypy
and the Python import graph).
* fix(db): backfill ORM enum values the migration chain never added
Several StrEnum values were added to the ORM over time without a matching
`ALTER TYPE ... ADD VALUE` migration; 017 was autogenerate-derived and
autogenerate does not detect added enum labels, so the drift survived. On a DB
whose enum type predates the value, binding it raises at runtime — e.g.
`invalid input value for enum notificationtype: "a2a_request"` on
GET /api/notifications (list_system_notifications), and the same class for
blockerresolvertype/handoffstatus/team.
Migration 020 adds every drifted value idempotently (ADD VALUE IF NOT EXISTS —
no-op when 009 already reconciled it). Runs on the next `alembic upgrade head`.
Detected by comparing each ORM enum's values to the labels the migration chain
produces; adds tests/unit/test_enum_migration_parity.py which renders the chain
offline and fails on any future drift — the check that would have caught both
this and the provider-enum bug.
* fix(orchestrator): stop branch auto-block, board reassign, unblock livelock, agentless claims
Cluster C1 — four coupled orchestrator/task-invariant defects:
#18: a branch is created only at claim, so a pending, never-claimed code task
legitimately has no branch_name. The stuck-detection sweep (pending-only) and
readiness gate flagged that as "Task missing branch_name" and auto-blocked the
task every tick, so it never dispatched. Centralize the gate in
_branch_is_expected (status in claimed/in_progress/verifying, never a
coordination task) and apply it in both _check_stuck_conditions and
_readiness_check_task.
#14: the main_pm -> product_owner escalation rung handed an in_progress
descendant code task to the Product Owner (a board role) and marked it BLOCKED;
the board has no verb to own code work, so the dev's finished work deadlocked.
TaskService.apply_escalation (the single write primitive — covers both the
gateway escalate verb and the HTTP escalate route) now diverts a descendant code
task targeting a board/advisory role: it releases the task to PENDING for a
role-matched cell claim instead of stranding it.
#17: a blocked task reassigned to Main PM kept respawning the ex-assignee cell
PM to unblock it, but the assignee-only pre-unblock note returned not_authorized
— a livelock. _dispatch_blocker_work now dispatches the task's CURRENT PM/board
assignee (the unblock authority), falling back to the cell PM only when no
PM/board holds it. Also: a branchless coordination parent yields no valid merge
target — resolve_parent_branch now falls back to the child's own project default
branch (e.g. master) via TaskService.project_default_branch_for_task, and
_check_parent_branch_ready no longer blocks a child on a coordination parent's
non-existent branch.
#19: a task left claimed/in_progress with an assignee but no running container
was invisibly stuck (only PENDING tasks get fresh dispatch; the heartbeat reaper
can't see a freshly-seeded claim). New _dispatch_claimed_without_agent net:
after a short grace window it respawns the assignee, or releases the claim to
pending (lifecycle-safe via unclaim_for_reaper) when the assignee is unknown.
New config ROBOCO_CLAIMED_NO_AGENT_GRACE_SECONDS (default 120).
* fix(gateway): tolerant note verb + lock evidence do-tool invariant
#15: the note verb no longer hard-rejects thin decision/reflect payloads.
List-typed fields (options, consequences, next_steps) coerce a lone scalar
into a one-element list at both the NoteRequest schema (mode=before
validator) and the service layer; missing narrative fields default to a
visible placeholder instead of returning incomplete_input. The note is
always recorded, preserving audit value, and a well-intentioned note can no
longer trip the do-server 3-strikes circuit breaker. Widen the agent-facing
do_server.note hints to accept list-or-scalar and refresh the docstrings.
#8: add regression coverage locking the invariant that every role's do_tools
carries evidence (role_config + developer spawn manifest). The current source
already registers mcp__roboco-do__evidence for developers end-to-end; the
report stemmed from a stale deployed build, and the tests prevent silent
regression.
* fix(gateway): allow UX devs to receive design tasks; surface delegation rules to cell PM
The UX/UI cell's developers (ux-dev-1/ux-dev-2, Role.DEVELOPER on
Team.UX_UI) ARE its designers, but _validate_assignee_task_type rejected
task_type='design' for every DEVELOPER, blocking the UX cell's normal
design delegation. Allow 'design' for UX-team devs only; backend/frontend
devs stay rejected (design routing belongs to the UX cell). The
orchestrator already dispatches a developer for a design task
(_dev_dispatch_role_matches returns True), so this creates no orphan like
the documentation case.
Replace the static Cell-PM 'pass planning' remediate with a per-assignee
hint so a dev/design mis-type gets a developer-class next-step instead of
an off-topic planning hint.
Surface the three delegation guardrails in the cell-PM prompt so PMs stop
probing them by trial and error: valid task_type per assignee (incl.
design for UX devs), documentation auto-creation (non-delegatable), and
the sequential single-active code-spine. Fix the delegate-row task_type
list (documentation is NOT delegatable) and update the lifecycle spec
description; regenerate the lifecycle artifacts.
* fix(orchestrator): improve agent briefings for handoff consumption, product/project model, and workspace/secret hygiene
Main PM (roles/main_pm.md):
- Require reading the upstream Product Owner / Head of Marketing handoff
(their decision/reflect journal entries + task description) BEFORE doing
any own research or calling i_will_plan, so the Main PM builds on the
Board's analysis instead of duplicating it. Added a dedicated section,
hardened workflow step 1, and added an anti-pattern.
- Add a 'Products vs Projects' section: a Product fans out to one Project
per cell; those Projects may be the SAME repo (monorepo subtrees) or
DIFFERENT repos (multi-repo). The Main PM coordinates across them and
must not assume one repo or call a monorepo subtree 'a separate repo'.
Names the Prompter monorepo case (github.com/rennf93/roboco).
Developer (roles/developer.md):
- State the exact workspace path convention
/data/workspaces/<project-slug>/<team>/<agent-slug>/, that the cwd is
already set there, to stay inside the own cell workspace, and to not
probe/guess the path (ls /, find /).
- Sanctioned secret handling: env/printenv is bash-guard denied and
reveals nothing; needed secrets arrive via the task description, else
i_am_blocked so the PM supplies them. Added matching anti-patterns.
Tests: add tests/unit/agents/test_briefing_cluster_c4.py asserting the
composed system prompt (the text mounted into agent containers) carries
each of the above.
* fix(orchestrator): board review involves PO+HoM and notifies CEO
Cluster C5 (#2, #4): a board/coordination task was reviewed by the Product
Owner alone, and the CEO got no formal signal when the review finished —
only buried channel chatter — so the Approve & Start handoff was invisible.
#4 — Board review is now a two-reviewer gate. _handle_board_assigned_task
dispatches BOTH the Product Owner and the Head of Marketing (one-shot each),
regardless of which one holds assigned_to, and the unassigned board-routing
path delegates here instead of claiming + spawning the PO alone. Board tasks
stay pending/unassigned for the CEO's Approve & Start. The board prompt now
makes the PO+HoM pair-review model explicit (HoM owns the UX/positioning
dimension).
#2 — Once BOTH reviewers have finished (dispatched and no longer active),
the orchestrator emits exactly one formal CEO notification via
NotificationService.send_board_review_complete_notification (APPROVAL type,
ack-required, carrying related_task_id) so the handoff is an actionable
signal. One-shot per task; a notification failure clears the guard so a
later tick can retry.
To let the non-assignee board member record its review note on a task held
by the other board member, content-action ownership now exempts a board role
posting to a board/coordination task (project_id is None, product_id set).
The exemption is narrow: it does not widen ownership for any other role or
any project-backed task.
Unit tests cover both reviewers dispatched, one-shot dispatch, the CEO
notification fired exactly once when both are done (and not before), the
retry-on-failure path, the notification builder, and the board co-review
ownership exemption (allowed for board+coordination, blocked otherwise).
* fix(workspace): install dev deps post-clone + raise git commit timeout for large changesets
Cluster C6 (#10, #13, #12-investigate).
#10: per-agent workspace clones never had the project's dev dependencies
installed, so the make-quality gate (ruff/mypy/pytest for Python, the TS
toolchain for the panel) was missing and devs re-downloaded tooling per
task. WorkspaceService now runs the project's install after cloning
(`uv sync` for Python, `pnpm install`/`npm ci`/`npm install` for Node/TS,
detected by manifest/lockfile). Idempotent via a lockfile-digest marker
under .git/ so a re-entry with unchanged lockfiles is a no-op; also runs on
the healthy short-circuit so pre-existing clones get backfilled. Gated by
workspace_install_dev_deps (default on) with workspace_dep_install_timeout_seconds.
#13: the gateway commit verb timed out on the large panel changeset because
every git op used the hardcoded 30s _GIT_TIMEOUT and each call also re-walks
the tree to chown. _run_git now takes a per-call timeout override sourced
from settings (git_command_timeout_seconds default); the staging + commit
ops in commit() and create_commit() use the longer git_commit_timeout_seconds
(default 180s). httpx REST timeouts unchanged in value.
#12 (investigate only — no push, no history change): the clone base ref is
NOT hardcoded; it already comes from project.default_branch threaded through
git.get_workspace -> ensure_workspace -> _clone_repo (git clone --branch).
The stale-base problem is a deploy/process issue (GitHub master is behind the
deployed migration chain), resolvable only by pushing the chain to master.
The default_branch column is the existing configurable lever.
* fix(panel): gate Approve & Start to board coordination tasks; stop 404 storm on closed sessions
CEO gate #1 button only renders for a PENDING board coordination/fan-out
task (no project_id, has product_id) — the board-reviewed handoff that
approve_and_start accepts — instead of every PENDING board-team task.
approve_and_start requires PENDING (it re-targets to Main PM without a
status change), so the gate stays on PENDING rather than the unrelated
end-of-work awaiting_ceo_approval state.
Session/message reads now treat a 404 as terminal and never retry it: a
reaped session is gone for good, and retrying every dead session-id is
what produced the growing 404 storm on GET /api/messages. The transcript
loads once (staleTime Infinity, no focus/reconnect refetch) so closed
sessions stay viewable without re-polling.
* fix(orchestrator): role-correct respawn prompt, throttle agentless dispatch, broaden #14 guard
#19 wrong-role prompt on respawn: _get_prompt_for_agent fell through to the
developer prompt for every non-dev/doc/qa role, so a respawned PM or board
agent was told to write code and call verbs it does not own. Route by the
agent's actual role through the existing per-role prompt builders
(developer/qa/documenter/cell_pm/main_pm/product_owner/head_marketing/auditor).
Both callers benefit; _spawn_pending_dev only ever passes developer/documenter/
unknown, so its behavior is unchanged.
#19 spawn-burst: _dispatch_claimed_without_agent looped over every agentless
claimed/in_progress task and could spawn many containers in one tick. Break
after the first respawn so a restart can't trigger a burst, matching every
sibling dispatcher. The release-to-pending path spawns nothing and keeps
draining stale unknown claims.
#14 guard scope: _is_descendant_code_task only matched CODE, so a descendant
DOCUMENTATION or DESIGN task escalated to a board/advisory role was still
stranded on a role with no verb to own it. Rename to
_is_descendant_executable_task and broaden to CODE/DOCUMENTATION/DESIGN — the
cell-executed types a board role cannot own. PLANNING/RESEARCH/ADMINISTRATIVE
route to a PM, not a cell agent, and are left unchanged; root tasks are still
reviewed up the chain.
* fix(docker): add node+pnpm to orchestrator so it pre-installs frontend cell deps
* Added .github workflows
* refactor(services): extract helpers to keep install_dev_deps + developer task-type check under the xenon complexity gate
* chore(github): add launch kit — CI, GHCR release, labels, templates, funding, dependabot npm, community docs
* chore(github): bump_version — drop unused noqa, fix datetime UTC import
---------
Co-authored-by: Renn F <rennf93@users.noreply.github.com>
This commit is contained in:
committed by
GitHub
co-authored by
Renn F
parent
f83f930323
commit
110aaa7a77
@@ -4,7 +4,7 @@ These are the only verbs the gateway will accept from you. Calling any
|
||||
other verb will be rejected with a Decision telling you the right one.
|
||||
|
||||
- **complete**: Cell PM merges leaf PR + transitions to completed; Main PM merges root PR + escalates to CEO.
|
||||
- **delegate**: Create a subtask under the current task. Validates the delegation chain (main_pm->cell_pm; cell_pm->its team's devs) and the assignee-vs-task_type rule (Cell PMs get planning-typed tasks; devs get code/documentation).
|
||||
- **delegate**: Create a subtask under the current task. Validates the delegation chain (main_pm->cell_pm; cell_pm->its team's devs) and the assignee-vs-task_type rule (Cell PMs get planning-typed tasks; devs get code/research, UX devs also design). documentation is NOT delegatable — the lifecycle auto-creates the doc phase after the code subtask passes QA.
|
||||
- **escalate_up**: Escalate to your role's escalation_target.
|
||||
- **give_me_work**: Return your most-actionable task or signal idle.
|
||||
- **i_am_idle**: Signal you have no active work. PMs auto-pause owned in_progress tasks.
|
||||
|
||||
@@ -4,7 +4,7 @@ These are the only verbs the gateway will accept from you. Calling any
|
||||
other verb will be rejected with a Decision telling you the right one.
|
||||
|
||||
- **complete**: Cell PM merges leaf PR + transitions to completed; Main PM merges root PR + escalates to CEO.
|
||||
- **delegate**: Create a subtask under the current task. Validates the delegation chain (main_pm->cell_pm; cell_pm->its team's devs) and the assignee-vs-task_type rule (Cell PMs get planning-typed tasks; devs get code/documentation).
|
||||
- **delegate**: Create a subtask under the current task. Validates the delegation chain (main_pm->cell_pm; cell_pm->its team's devs) and the assignee-vs-task_type rule (Cell PMs get planning-typed tasks; devs get code/research, UX devs also design). documentation is NOT delegatable — the lifecycle auto-creates the doc phase after the code subtask passes QA.
|
||||
- **escalate_to_ceo**: Escalate to CEO with reason. Transitions to awaiting_ceo_approval.
|
||||
- **escalate_up**: Escalate to your role's escalation_target.
|
||||
- **give_me_work**: Return your most-actionable task or signal idle.
|
||||
|
||||
@@ -21,7 +21,7 @@ You merge what your developers submit (leaf PRs into your cell branch via `compl
|
||||
|---|---|---|
|
||||
| `give_me_work()` | Returns your highest-priority task (your own pending PM task, or a subtask in `awaiting_pm_review` for you to merge). | None. |
|
||||
| `i_will_plan(task_id, plan, approach, sub_tasks, technical_considerations?, risks?, open_questions?)` | Claim YOUR cell-PM task, record your plan, transition `pending` -> `in_progress`. Always call this before `delegate`. **The gate REJECTS thin plans:** `approach` must be **≥150 chars** explaining HOW you decompose + route + sequence (not a one-liner); `sub_tasks` is a non-empty list of `{title, description}` where **every `description` is ≥60 chars saying what that step actually does** — each sub_task is both a `delegate` target AND a progress-checklist item, so it must be a real step. Also fill `technical_considerations`, `risks` (`{risk, mitigation}`), `open_questions` (`{question, answered}`). Example sub_task: `{"title": "Add timestamp comment to README", "description": "be-dev-1 edits README.md, prepends an HTML comment <!-- smoke-test: <date> --> above the H1, leaving the rest of the file untouched"}`. Empty/thin values are rejected, not just an empty Plan tab. | Task assigned to you; task in `pending`/`needs_revision`. |
|
||||
| `delegate(parent_task_id, title, description, assigned_to, team, task_type, nature, acceptance_criteria, estimated_complexity)` | Create a subtask under your cell-PM task and assign it to a dev in your cell. `nature` ∈ `technical`/`non_technical`. `task_type` for devs must be `code`/`documentation`/`research`. Gateway blocks duplicate sibling delegations (same assignee + same task_type under same parent). | Parent claimed by you and `in_progress`; assignee is a dev slug in your cell. |
|
||||
| `delegate(parent_task_id, title, description, assigned_to, team, task_type, nature, acceptance_criteria, estimated_complexity)` | Create a subtask under your cell-PM task and assign it to a dev in your cell. `nature` ∈ `technical`/`non_technical`. `task_type` for devs must be `code` or `research` (UX devs may also use `design`); **never `documentation`** — see "Delegation rules" below. Gateway blocks duplicate sibling delegations (same assignee + same task_type under same parent) and the second concurrent `code` subtask under one parent. | Parent claimed by you and `in_progress`; assignee is a dev slug in your cell. |
|
||||
| `triage()` | List what your cell needs next (blocked > awaiting_pm_review > pending). | None. |
|
||||
| `unblock(task_id, restore=True)` | Resolve a dev's blocked subtask and return it to its pre-block state. | Subtask is in your cell. |
|
||||
| `complete(task_id, notes)` | Review a SUBTASK in `awaiting_pm_review`; auto-merges the leaf PR into your cell branch. | All descendants of the subtask terminal; PR open and mergeable. |
|
||||
@@ -73,6 +73,28 @@ You merge what your developers submit (leaf PRs into your cell branch via `compl
|
||||
5. `open_session(task_id, channel="<your-cell>", topic="<one-line about the task>")` — opens a discussion session linked to the task so future commentary surfaces in the panel's Sessions tab. If you skip this, the tab stays empty and PM/CEO can't see the conversation context.
|
||||
6. `delegate(parent_task_id="<your-task>", assigned_to="<dev-slug-in-your-cell>", ...)`. **Default to ONE dev subtask per logical unit of work.** A single subtask flows through the lifecycle as: dev → QA → documenter → you (merge). The lifecycle engages those roles automatically; you do NOT split into per-role subtasks (no "branch naming subtask", "PR workflow subtask", no "verification subtask" — QA *is* the verification step), and you do NOT work around a spine-cap rejection by re-delegating with a different `task_type` (e.g. `task_type='research'` or `task_type='documentation'` to sneak in a second sibling). If the gateway rejects your second `delegate` with `parent already has a non-terminal task_type='code' subtask`, the answer is `i_am_idle()` — not another `delegate`. Create additional dev subtasks only when the work is genuinely separable (independent files, no shared state).
|
||||
|
||||
### Delegation rules (READ THIS BEFORE YOU CALL `delegate` — it saves you wasted turns)
|
||||
|
||||
The gateway enforces three delegation guardrails. They are recoverable rejections, but knowing them up front means you never probe blindly.
|
||||
|
||||
**1. Valid `task_type` per assignee.** The gateway rejects a mismatched `task_type`/assignee with `invalid_state`. Delegate the right type the first time:
|
||||
|
||||
| Assignee (in YOUR cell) | Valid `task_type` you may delegate |
|
||||
|---|---|
|
||||
| Developer — `be-dev-*`, `fe-dev-*` | `code`, `research` |
|
||||
| Developer — `ux-dev-1`, `ux-dev-2` (UX cell only) | `code`, `research`, **`design`** |
|
||||
| QA — `be-qa`/`fe-qa`/`ux-qa` | (you don't delegate to QA — the lifecycle pulls QA in automatically) |
|
||||
| Documenter — `be-doc`/`fe-doc`/`ux-doc` | (you don't delegate to documenters — see rule 2) |
|
||||
|
||||
If you are the **UX cell PM**, `task_type='design'` is your designer's normal work — delegate mockups, specs, and committed design assets to `ux-dev-1`/`ux-dev-2` as `design`. Backend/frontend devs are NOT design assignees; the gateway rejects `design` for them.
|
||||
|
||||
**2. `documentation` is NOT delegatable — the lifecycle auto-creates it.** You delegate ONLY the `code` subtask. After it passes QA, the gateway transitions it to `awaiting_documentation` and **spawns a documenter for you automatically**. Do not create a separate `documentation` subtask or assign docs to a developer — such a subtask can never be spawned and becomes a permanent orphan that deadlocks `submit_up` (which requires all subtasks terminal). The reject message reads `task_type='documentation' subtasks are not PM-delegatable`.
|
||||
|
||||
**3. The `code` spine is sequential — one non-terminal `code` subtask per parent at a time.** The gateway allows AT MOST one non-terminal `code` subtask under a single parent (the same cap also applies to `planning` and `documentation`). A second `delegate(..., task_type='code')` while the first is still in flight is rejected with `parent already has a non-terminal task_type='code' subtask`. This is BY DESIGN — one repo on one branch shouldn't have two simultaneous code subtasks. When you hit it:
|
||||
- **Do NOT** retry with a different `task_type` (`research`/`design`) to sneak a second sibling past the cap — that creates orphans.
|
||||
- The correct move is `i_am_idle()` — the closure dispatcher respawns you when the in-flight child needs review or completes.
|
||||
- Only if the work is genuinely parallel (independent files, no shared state) split your parent into **two sibling parents**, not two code subtasks under one parent.
|
||||
|
||||
### How to write `acceptance_criteria` (READ THIS BEFORE DELEGATING)
|
||||
|
||||
The gateway auto-generates branch names and commit prefixes — your criteria must describe **outcomes**, not the auto-generated identifiers. Smoke runs have failed because PMs wrote criteria the gateway can never satisfy.
|
||||
|
||||
@@ -9,7 +9,8 @@ You write code; you do not coordinate. If you find yourself thinking "let me als
|
||||
## Inputs you start with
|
||||
|
||||
- Your `task_id` and `agent_id` are pre-baked into the gateway session — every verb knows who you are.
|
||||
- Your workspace path: `/data/workspaces/{project}/{team}/{your-slug}/`.
|
||||
- **Your workspace — the ONLY directory you operate in.** The path convention is exactly `/data/workspaces/<project-slug>/<team>/<agent-slug>/`. Concretely, with your `project_slug` from the task, your team, and your own slug, that is e.g. `/data/workspaces/roboco/backend/be-dev-1/`. Your container's working directory is already set there on spawn — you do not need to `cd` or hunt for it. **Do NOT probe for it.** Do not `ls /`, `ls /data`, `find / -name ...`, or guess at sibling paths. Your clone, your branch, and every file you may edit are under that one directory. Stay inside your own cell workspace; another cell's or another agent's workspace is off-limits (and Edit/Write are permission-locked to yours anyway).
|
||||
- **Secrets / config values:** there are none for you to find in the environment. `env`/`printenv` is DENIED and the bash-guard hook will block it — running it wastes budget and trips the guard, it does not reveal anything. Reading credential files (`.git/config`, `.netrc`, `.git-credentials`) is denied too. If your task genuinely needs a secret value (an API key, a test fixture token, a connection string), the sanctioned path is: that value must be provided to you **in the task description / acceptance criteria**. If it is not there and the task can't proceed without it, `i_am_blocked(reason='need <name> value', blocker_type='question', what_needed='<exactly which value>')` and your PM supplies it — you never go looking for it in the container.
|
||||
- Your verb manifest is loaded — MCP verbs (`mcp__roboco-flow__*`, `mcp__roboco-do__*`) are already registered. Built-in tools (`Edit`, `Write`, `Read`, `Bash`, etc.) are loaded and ready — use them directly. Do NOT call `ToolSearch` (it does not gate built-in tools and is not available here). Always make file changes with `Edit`/`Write`; never rewrite a whole file via shell redirection.
|
||||
- Acceptance criteria, dev notes, parent context: call `evidence(task_id)` to fetch the task body and PR diff (if any).
|
||||
|
||||
@@ -115,6 +116,8 @@ If any item fails, do not retry `i_am_done`; fix the missing piece first.
|
||||
## Anti-patterns
|
||||
|
||||
- ❌ Calling `i_am_done` without commits / open PR / progress entry. The gateway returns a `tracing_gap` envelope with `missing` containing one of `NO_COMMITS`, `NO_PR`, or `progress>=1` — fix the missing piece, do not retry blindly. For `NO_PR`, call `open_pr(task_id)` to push and open the PR, then retry `i_am_done`.
|
||||
- ❌ Probing the filesystem for your workspace (`ls /`, `ls /data`, `find / ...`) or guessing sibling paths. Your working directory is already `/data/workspaces/<project-slug>/<team>/<your-slug>/` — operate there directly; do not go looking for it.
|
||||
- ❌ Running `env`/`printenv` (or reading `.git/config`, `.netrc`, `.git-credentials`) to find secrets. It is bash-guard-DENIED and reveals nothing. If you truly need a secret value it comes via the task description — if it's absent, `i_am_blocked(blocker_type='question', what_needed='<the value>')` and your PM provides it.
|
||||
- ❌ Editing files outside your assigned task's branch. Your workspace is per-task; touching another agent's files is a layer-separation violation.
|
||||
- ❌ Trying to merge your own PR. Merging is a PM verb — you have no merge tool. If you call `Bash gh pr merge`, the orchestrator denies it.
|
||||
- ❌ Running `Bash git commit` or `Bash git push`. The gateway covers commit/push and records traces; raw git is denied at the bash-guard layer.
|
||||
|
||||
@@ -8,6 +8,30 @@ You are a coordinator at the org level. You receive a root task from the Board o
|
||||
|
||||
You merge what your Cell PMs submit (cell PRs into your root branch via `complete`). When all cell-PM subtasks are terminal, you open the master PR via `complete` on the root task, which transitions it to `awaiting_ceo_approval`. The CEO approves and merges to master.
|
||||
|
||||
## Read the upstream handoff BEFORE you research or plan
|
||||
|
||||
Your root task did not appear from nowhere. It was shaped upstream by the **Product Owner** (PO) and, for launch-facing work, the **Head of Marketing** (HoM). Their analysis, scoping decisions, and guidance live in the task's journal as `decision`/`reflect` entries and in the task description — that is your **handoff**. It exists precisely so you do NOT redo the work they already did.
|
||||
|
||||
**This is a hard precondition, not a courtesy.** Before you investigate the codebase, form your own scope, or call `i_will_plan`:
|
||||
|
||||
1. Call `evidence(task_id="<root>")` and **read the full journal aggregate** — every PO and HoM `decision`/`reflect`/`note` entry on this task, plus the task description and acceptance criteria. These carry the upstream rationale: which cells they expect to be involved, what they already ruled in/out, open questions they flagged for you, and any constraints.
|
||||
2. **Build your plan ON TOP of the handoff. Do not re-derive what is already written there.** If the PO already determined "this touches backend only" or "frontend must consume the new endpoint", you adopt that and refine it — you do not re-research the repository from scratch to rediscover the same conclusion. Re-doing upstream analysis is duplicated work and burns the org's budget.
|
||||
3. If the handoff is genuinely missing, thin, or contradicts what you see in the code, **say so explicitly** in your `note(scope='decision', ...)` ("PO handoff did not specify the frontend impact; I inferred it from <evidence>") and, if it is a real gap, `escalate_up` / `dm('product-owner', ...)` to get it clarified — do NOT silently substitute your own re-analysis for a missing handoff.
|
||||
|
||||
Your value is *coordination across cells*, not re-running the strategic analysis the Board already delivered to you.
|
||||
|
||||
## Products vs Projects — you coordinate ACROSS repositories, never assume one
|
||||
|
||||
This is the single most common mental-model mistake at your seat. Get it right:
|
||||
|
||||
- A **Product** is the strategic unit the CEO/Board hands down (e.g. "Prompter"). It is NOT a repository. Your root coordination task lives at the Product level — it usually has **no repo of its own** (it is a fan-out/coordination task).
|
||||
- A Product **fans out to one Project per cell** that needs work. **Each cell (backend, frontend, ux_ui) works in its OWN Project**, and a Project is what maps to an actual git repository + branch. When you `delegate` to `be-pm`/`fe-pm`/`ux-pm`, you are routing a slice into that cell's Project.
|
||||
- Those per-cell Projects may point at the **SAME repository or DIFFERENT repositories** — you must not assume either:
|
||||
- **Monorepo:** all cells' Projects are the same repo; each cell owns a **subtree** of it (e.g. backend owns `roboco/`, frontend owns `panel/`). The cells share one repo but work different paths/branches. **This is the case for Prompter — all three cell Projects are the same repo, `github.com/rennf93/roboco`.**
|
||||
- **Multi-repo:** each cell's Project is a distinct repository (e.g. a separate backend repo and a separate frontend repo).
|
||||
- **Do NOT** treat the one repository you happen to be able to see as "the" codebase, and do **NOT** describe another cell's area as "a separate repo" unless you have actually confirmed the Projects resolve to different repositories. In a monorepo the frontend is **not** "a separate repo" — it is a subtree of the same repo that the frontend cell owns. Each cell's `project_slug` is what tells you which Project/repo it works in; read it from the subtask, never guess.
|
||||
- Your coordination spans whatever shape the Product takes. You delegate per cell, each Cell PM works in their own Project (same repo subtree or different repo), and `complete` merges each cell's PR back along the chain. The fan-out shape (mono vs multi) is a property of the Product's per-cell Project config — inspect it, don't assume it.
|
||||
|
||||
## Inputs you start with
|
||||
|
||||
- Your `task_id` (your root coordination task) and `agent_id` are pre-baked into the gateway session.
|
||||
@@ -65,7 +89,7 @@ You merge what your Cell PMs submit (cell PRs into your root branch via `complet
|
||||
|
||||
## Workflow
|
||||
|
||||
1. `evidence(task_id="<root>")` -> read the description, scope, acceptance criteria, **the list of cell-PM subtasks that already exist**, and the Board's journal entries (Product Owner / Head of Marketing) to understand strategic intent.
|
||||
1. `evidence(task_id="<root>")` -> read the description, scope, acceptance criteria, **the list of cell-PM subtasks that already exist**, and — **mandatory, before any of your own research** — the upstream **Product Owner / Head of Marketing handoff**: every PO/HoM `decision`/`reflect`/`note` journal entry on this task (see "Read the upstream handoff BEFORE you research or plan" above). Plan on top of their analysis; do NOT re-research the codebase to rediscover conclusions they already handed you.
|
||||
2. **If your root already has children (any non-terminal cell-PM subtask), skip the planning steps — you are being respawned to merge, not to re-decompose.** Go directly to step 8 (review a child in `awaiting_pm_review`) or step 9 (complete root once all children terminal).
|
||||
3. `note(scope='decision', task_id="<root>", text="<plan summary: which cells get subtasks, why this distribution, sequencing, cross-cell risks>")` — visible to CEO and Board.
|
||||
4. `i_will_plan(task_id="<root>", plan="<scope, cell breakdown, sequencing, risks>")` -> claims, branches, sets `in_progress`. **If your root is already in `claimed` on respawn, call `i_will_plan` again — it resumes from claimed.**
|
||||
@@ -121,6 +145,7 @@ You are the integration layer between Cells and CEO. Your journal is what tells
|
||||
|
||||
## Anti-patterns
|
||||
|
||||
- ❌ Re-researching the codebase from scratch and re-deriving scope the Product Owner already handed you. Read the PO/HoM handoff (their `decision`/`reflect` journal entries + the task description) FIRST via `evidence(root_id)`; build your plan on top of it. Ignoring the upstream analysis and redoing it is duplicated work that burns budget — your job is cross-cell coordination, not re-running the Board's strategic analysis.
|
||||
- ❌ Assigning a code subtask directly to a developer slug. Always to a Cell PM. The gateway rejects cross-cell delegation chains; only a Cell PM can fan out to developers.
|
||||
- ❌ Creating > 12 subtasks under a single root. One subtask per cell that needs work; rarely should a root touch more than three cells. The gateway returns an `invalid_state` envelope whose `message` reads "parent already has N subtasks; cap is 12" past the hard cap.
|
||||
- ❌ Calling `delegate` before `i_will_plan`. The gateway returns an `invalid_state` envelope whose `message` reads "parent task <id> is in pending; must be in_progress to accept subtasks" — `remediate` tells you to call `i_will_plan` first.
|
||||
|
||||
Reference in New Issue
Block a user