* feat(cms): add verified desktop touchpoint hosts and Test acceptance * fix(cms): keep Test modal scrim above app chrome * fix(cms): load host styles and support hover packages * fix(cms): report mounted host compatibility for restoration * fix(cms): parse Vela actions in shared manifests without executing them * fix(cms): preserve authorized actions and correct modal and hover behavior (#8003) * fix(cms): harden touchpoint host interactions * fix(cms): preserve modal actions and verify effective close controls * test(cms): cover hover exit and above-anchor placement * fix(cms): hide client test controls by default * fix(cms): persist automatic campaign impressions per account and device * fix(web): remove host campaign close button * fix(cms): suppress campaign modals during onboarding * fix(cms): unify test and production campaign lifecycle (#8118) * fix(cms): enable safe campaign navigation in test and production * fix(cms): enforce server-authorized touchpoint lifetimes * fix(cms): refresh production touchpoints when client language changes * fix(cms): stabilize hover refresh and synchronize Test locale * fix(cms): preserve campaigns on focus and remember Test dismissal * fix(cms): discover Test deployments without reloading * fix(cms): keep granted touchpoint display authority through transport failures A refresh that times out or fails in transport is not a withdrawal, but the shared lifecycle treated every failure the same way: `status = "error"` then `revoke()`, which tore down a lease the server had already granted and was still inside its own deadline. One slow poll therefore blanked a running campaign until the next 30s tick, and a second failure could not restore it because the value had been dropped. `abandonAttempt` now names the invariant: cancel the attempt, keep the lease, and let `armExpiry` retire it at the deadline the server actually granted. The lease length is the bound, so no retry budget is needed — Test's sixty-second contract survives exactly one missed poll, and Production survives as many as its authorization covers. Three cases still clear, and one of them is new: - the failure carries the server's own withdrawal. A 410 is authoritative even when its receipt body is unreadable, so `ProductionTouchpointLoadError` now marks that one case and the lifecycle honours it. Without this, a malformed 410 would have been ridden out as if it were transport noise. - nothing is mounted, or the lease was already fenced by `wake`. Page recovery has no evidence the activity is still live, so it stays withdrawn. - the lease has run out on its own. This does not fix OPEND-3237, which is a new activity failing its FIRST load: there is no prior lease to keep and the display stays empty. It fixes the adjacent class where a mounted activity is erased by a transient refresh. * fix(cms): keep a failed refresh recoverable inside its own poll cycle Three changes to how one refresh cycle behaves when it does not go cleanly. None of them fixes OPEND-3237, whose first-load failure is still unexplained; they remove the ways a working campaign is lost to an ordinary hiccup. Bounded retries. A failed attempt used to get its next chance from the fixed 30s tick. For the sixty-second lease the Test runtime is granted, that chance lands exactly when the lease expires, so a single failure put display on the edge of going blank with nothing able to recover it. Retries at 1s and 3s give a fast failure — transport error, 5xx, DNS — several chances while the lease is still comfortably alive. A retry must finish inside the cycle that spawned it. `refresh` declines to start while a request is in flight, so a chain that ran past the next tick would not merely be late: it would swallow that tick entirely. Worst case was 15+1+15+3+15 = 49s against a 30s interval. Scheduling now requires room for the retry AND its full budget, which is also what makes "retries cover fast failures" true in the code rather than only in a comment — an attempt that burned the whole budget leaves no room by construction and is never retried. The retry budget resets per cycle, not per success: otherwise the first cycle to exhaust its retries would leave every later cycle with none. Request budget 10s -> 15s. One refresh fetches a context and every enabled placement, so the budget covers a round, not a request. A real round of 11.5s whose placements all succeeded was being abandoned by the ten-second budget. It stays well under the 30s interval on purpose. Forward `accept-encoding` through the touchpoint runtime proxy. Decisions carry base64 content and run to megabytes, and the proxy built its upstream headers from scratch, dropping the caller's preference — every refresh pulled the payload uncompressed, measured at 383KB against 214KB for the same decision. Because the body is piped through verbatim, upstream's `content-encoding` has to be handed back with it, or the caller decodes gzip as JSON; both halves land together. Verified end to end through daemon and web: 2,149,685 -> 1,606,678 bytes on the wire, byte-identical after decode. An authoritative withdrawal is never retried: a 410 that took a campaign off the screen must not put it back. * fix(cms): present each Test campaign modal once per account and device Test modal presentations now share the production touchpoint-displayed:v1 impression: recorded once visible, read before any new automatic opening, and persisted across reload, remount, and client restart. * fix(cms): give the Test control readout an explicit ladder weight
8.2 KiB
CMS Codex 验收交接(2026-09-10)
目的与边界
本交接覆盖本 PR 的已完成代码、可复跑验收和剩余阻断项;它不授权合并、部署、生产操作、Plane 更新或自动关闭任何工单。认证、部署状态、远端 CI、合并和已部署版本均为 UNKNOWN,除非接手者以自己的安全登录态重新读取并记录。不得读取凭据、不得静默改指向生产、不得接管其他运行时。
依赖顺序:既有 Vela #1963 的分支 codex/cms-content-selection → 本 Vela 后续 PR;既有 Open Design #7986 的分支 codex/fix-cms-shared-manifest(其原有 base codex/cms-admin-hosts-e2e 保持不变)→ 本 OD 后续 PR。两仓库不可合为一个 PR。
状态矩阵
| 验收 ID | 状态 | 本 PR 实现/本地测试 | 当前浏览器/集成 | 结论 |
|---|---|---|---|---|
| AC-2998 | 已实现,局部验证 | 四位年份上限、blur/save;Admin 定向测试与 lint 通过 | Admin 真浏览器和持久化读回 UNKNOWN | 不可声称已部署 |
| AC-3020 | 已实现,局部验证 | API/BFF/Admin 字段错误、create/edit 保留及 update failure-seam 测试通过 | 真 Admin/API UNKNOWN | 不可声称已部署 |
| AC-3000 | 已实现,局部验证 | 反斜杠/控制字符/哨兵源拒绝,query/hash 允许;contracts 通过 | 受控 Chromium helper 通过;所有 placement/Test 默认拒绝 UNKNOWN | 非端到端 |
| AC-3001 | 已实现,局部验证 | host fingerprint 纳入 overlay;定向测试通过 | 编译运行时 fingerprint UNKNOWN | 开发者指纹测试,不是通用 UI 断言 |
| AC-3009 | 部分实现 | 内容尺寸/视口 CSS 与测试通过;保留无条件 host Close 兼容 fallback | 精确编译包、500px/窄/短滚动 UNKNOWN | 重复 Close 未修复 |
| AC-3010 | 既有 base 行为 | 无本 PR 独立修复 | UNKNOWN | 不归功于本 PR |
| AC-3013 | 已实现,局部验证 | top-right host/相对定位及结构测试通过 | 最终 EntryShell/账号角标集成 UNKNOWN | 不可声称完整布局验收 |
| AC-3014 | 部分浏览器验证 | hover 几何与组件测试通过 | 受控 Chromium:三次慢速正反跨 8px、可信 Shadow SDK action、Escape 焦点、窄屏翻转通过;非真实 dispatcher/native linked runtime | 受控证据,不是全链路 |
| AC-3002 | FOLLOW-UP / FAIL | 当前 ProductionCampaignModal 仍 await telemetry;500/network 拒绝已授权 action |
不把早期 Vela click harness 当 OD 重现 | 必须单独修复后复测 |
历史恢复/既有事项 2999、3005、3007、2982、3021 不是本 PR 的自有变更;恶意 SVG 与五个 pending receipt 仍为历史未闭环发现。源 ZIP 中缺少 girl.webp 并不代表包损坏:源 girl-source.jpg 会编译为 girl.webp。
可观察验收(测试人员)
- AC-2998:新建与编辑各输入六位年份,blur 后保存应拒绝;输入有效四位年份,日历值保存后保持。
- AC-3020:分别验证 past-start、end<=start、missing、not-ready、unsupported placements 的单字段错误;新建/编辑中返回 4xx 与拒绝的 5xx 都保留名称、Ready 内容版本、placements、开始、结束、时区六字段。Ready selector 可能阻止无效版本,需使用受控后端错误 fixture,不要伪造 UI 输入。
- AC-3000:
/projects?view=active#recent可用;反斜杠、/\\evil.example、slash+tab/newline 必拒绝;混合 manifest 只允许本 host action;Test 默认拒绝。 - AC-3013/3014:右上入口与账号角标同时存在且没有底部重复;慢速正向/反向各跨 8px 缝隙三次后可点真实 action;再验外部离开、窄屏翻转、Escape 与焦点返回。
- AC-3009:500px、窄屏、短屏滚动与 fallback Close;记录“重复 Close 未修复”,不得把 fallback 当单一 Close 证明。
- AC-3002(修复后强制复测):先保持 auth 拒绝,再独立验证 telemetry 500/network 不撤销已经授权的 action;冻结策略后再分类 401/403/409。
- AC-3001:比较开发者提供的编译包 fingerprint,不以普通 UI 画面替代。
安全运行手册
- 以两个隔离 checkout 加载候选;先确认显示的 source/build runtime 属于候选 SHA,绝不复用或重启用户拥有的
17686/17687、agent-cms-operator-da21。 - Open Design 仅按 scoped docs 启动:
OD_DATA_DIR=<candidate>/.tmp/joint-validation-browser/data corepack pnpm@10.33.2 tools-dev run web --namespace cms-joint-validation-browser --daemon-port 19786 --web-port 19787。端口19786/19787及 fixture19788为本次 owned 约定;如占用,停止并记录,不接管。 - Vela 仅用其 scoped docs 的
pnpm dev/with-env隔离命令和自己的 sandbox;不自行编造认证、fixture 或环境变量。需要登录时请测试者通过安全用户登录完成,不读 secret。 - 固定源归档:
/Users/alche/Downloads/deepseek-v4.1-flash-五点位测试组件.zip,SHA-256690d897450e4a53af269ffcd40cb4ab393652f58b5856cfd8abf9f6185028ad6。每次还要记录新编译包的身份/fingerprint;历史活动wobpnxd7ptplgjjzevqx9xyd与 deploymentgbaa211ukd9duci6c66prrgy不是当前已验证身份。 - 每条证据使用:
ID / 步骤 / 期望 / 实际 / PASS|FAIL|UNKNOWN / build SHA / 环境 / 包 SHA / 时间 / 截图或网络或 receipt / 回归影响。Codex 返回报告与 defect;不得宣称获得 merge/deploy 授权。
最终无回归门(所有修复、所有最终 commit 之后)
对每个 bug 用相同 client/environment/package 重复原始复现;只隔离比较 baseline,绝不回退用户运行时。随后跑:五个 placement、upload→build→Ready→Test→retract→edit→new Test、stale-context deny、receipt 在 Admin 持久可见、modal/badge/hover 共存、locale、calendar、schedule/expiry/revocation、可恢复网络失败。生产共存只允许隔离 test fixture,不做生产操作。任一复测失败:修复→复测→重跑受影响回归;最终 SHA 改变即使旧证明失效。完整验收要求无 P0/P1;部分 PR 是否合并必须显式人工决定,绝不自动。
回滚仅通过已评审的 follow-up revert PR;禁止盲 revert 或生产回滚。签收:PENDING。
开发者附录
客户端语言联动补充(2026-09-14)
- 生产弹窗、账号徽标、悬浮入口与详情使用客户端 i18n 语言,并以「账号 + 语言」隔离加载、授权和挂载状态;渲染仍使用 CMS 返回的
content.locale,不改服务端翻译与回退规则。 - 验收入口:设置 → 通用 → 界面语言。切换后返回首页,徽标与悬浮入口/详情应显示新语言;相同 activity、decision 和 content version 身份不能阻止语言替换。
- 正在显示的同一活动弹窗取得新语言授权后继续展示;已关闭的活动不能因切换语言重新弹出。旧语言迟到响应和失效授权不得恢复旧展示。
- 回归入口:
apps/web/tests/components/ProductionCampaignBadge.test.tsx、ProductionCampaignHover.test.tsx、ProductionCampaignModal.test.tsx,以及touchpoint-lifecycle.test.ts。 - 本地浏览器通过实际设置控件执行英文 → 简体中文 → 英文,并观察请求参数与 Shadow DOM 内容;中文弹窗关闭后切回英文未重开。验证边界:真实 web/daemon + 本地 CMS HTTP fixture + 模拟官方桌面宿主接口,非真实 Electron 或线上 CMS 验收。fixture 未提供账号工作区服务,截图中的账号连接提示不是本次验收对象。
| 英文首页 | 语言设置入口 | 中文首页 |
|---|---|---|
![]() |
![]() |
![]() |
- Vela 协议源
packages/shared/src/touchpoints.ts的最终 SHA-256:be26f9c4e5cfe6e0a0eedee3d31dc70df8f1c8ee61704e765d4f5c89879fc2f0;ODTOUCHPOINT_COMPONENT_V2_UPSTREAM_PROVENANCE.sourceSha256.touchpoints必须与其一致。 - 已记录本地:Vela root
pnpm lintPASS;Edit 定向42 passed;OD contracts6、combined30、typecheck/guard PASS。此前 OD #3001 production build 只可称“单独验证”,不可称 combined build。 - #3002 源缺陷位置:
apps/web/src/components/ProductionCampaignModal.tsx:96-128。#3009 仅为 sizing patch,unconditional host Close 保留。


