Commit Graph
89 Commits
Author SHA1 Message Date
istos db3b56b737 merge main into task/35: keep both rails' folded strips and 34's lede
article.html: 34 added the lede under the h1, 35 added the folded
contents strip in the same place. Both belong, and site.css settles the
order — its lede adjacency names .menu-contents + p, so the strip sits
between the title and the lede.

Two things the merge exposed rather than caused:

- $toc and $sidebar were spelled inside article.html's own comments,
  and string.Template substitutes there too, so every page carried a
  second copy of both rails inside a comment (28 toc links for 7
  headings). Doubled to $$toc / $$sidebar, as the template contract
  already said to.
- test_site_pages assumed one rendering of each rail. Both are now
  written twice by design, so the tests assert every rendering agrees
  with the page instead of assuming there is one.

The card file keeps main's location: the board owns a card's stage, and
main had already moved 35 to review/.
2026-07-31 15:27:00 +02:00
istos 5f11108d56 board: 41 → done (istos) 2026-07-31 15:16:14 +02:00
istos 51206b3dba board: 35 PR opened (istos) 2026-07-31 15:13:05 +02:00
istos e43afb8684 board: 41 PR opened (istos) 2026-07-31 15:13:02 +02:00
istos 85469537e5 tasks: five cards from this session's review of the board
37 sync resolves its remote like github.py does, and says so when it
cannot; 38 a card being merged wears the state and holds still; 39 the
tab says whether agents are working; 42 a long closing report keeps its
headline instead of its tail. 40 (the open-questions launch gate) is
archived, unmoved by the board and so never committed by one.
2026-07-31 15:06:19 +02:00
istos 800cbc6429 board: 41 → review (istos) 2026-07-31 15:01:56 +02:00
istos 4d60872625 board: 35 → review (istos) 2026-07-31 14:58:26 +02:00
istos b89e9c6ed4 board: 25 → backlog (istos) 2026-07-31 14:54:25 +02:00
istos e2c0738763 board: 41 → in-progress (istos) 2026-07-31 14:49:15 +02:00
istos 36b9f8c43d board: 35 → in-progress (istos) 2026-07-31 14:40:08 +02:00
istos 6204e1ad50 board: 34 → done (istos) 2026-07-31 14:40:08 +02:00
istos 016b28254d board: 35 → in-progress (istos) 2026-07-31 14:39:26 +02:00
istos 9bf20e8dd7 board: 34 → done (istos) 2026-07-31 14:39:17 +02:00
istos c42e24253a board: 34 PR opened (istos) 2026-07-31 14:31:52 +02:00
istos 9b494a3f0e board: 34 → review (istos) 2026-07-31 14:31:44 +02:00
istos f15d7bd3e9 board: 36 → to-do (istos) 2026-07-31 14:11:24 +02:00
istos 8695b859b3 board: 35 → to-do (istos) 2026-07-31 14:11:21 +02:00
istos 93f36e6e26 board: 34 → in-progress (istos) 2026-07-31 14:11:19 +02:00
istos 29c6dc1dd1 board: 33 → done (istos) 2026-07-31 14:11:19 +02:00
istos 59012ec7fa board: 33 PR opened (istos) 2026-07-31 14:11:01 +02:00
istos 165fc0e40b board: 33 → review (istos) 2026-07-31 12:10:57 +02:00
istos 68ee681c18 board: 33 → in-progress (istos) 2026-07-31 11:51:50 +02:00
istos bca3f3055e board: 32 → done (istos) 2026-07-31 11:51:49 +02:00
istos 25b55d5734 board: 32 PR opened (istos) 2026-07-31 11:49:17 +02:00
istos 0ff6457cae board: 32 → review (istos) 2026-07-31 11:49:09 +02:00
istos 6828bd8c19 board: 32 → in-progress (istos) 2026-07-31 11:34:06 +02:00
istos a36242e4fe board: 31 → done (istos) 2026-07-31 11:33:32 +02:00
istos 1b5cd1495f board: 31 PR opened (istos) 2026-07-31 11:32:34 +02:00
istos 1a55dc46df board: 31 → review (istos) 2026-07-31 11:31:50 +02:00
istos eafd1ad546 board: 31 → in-progress (istos) 2026-07-31 11:12:41 +02:00
istos 66c6ce0165 board: 30 → done (istos) 2026-07-31 11:12:41 +02:00
istos 7dc336d33f board: 30 PR opened (istos) 2026-07-31 11:10:18 +02:00
istos e304829a26 board: 30 → review (istos) 2026-07-31 11:10:09 +02:00
istos 163e705e45 board: 30 → in-progress (istos) 2026-07-31 10:59:20 +02:00
istos 1161552f8b board: 29 → done (istos) 2026-07-31 10:27:52 +02:00
istos 086f1bd76f board: 29 PR opened (istos) 2026-07-31 07:56:33 +02:00
istos 6cb7fc7eee board: 29 → review (istos) 2026-07-31 07:56:24 +02:00
istos 96fcae7d8c board: 29 → in-progress (istos) 2026-07-31 07:45:15 +02:00
istos 8ab97398a5 board: 10 → done (istos) 2026-07-30 15:10:59 +02:00
istos c9fbf17775 board: 10 PR opened (istos) 2026-07-30 15:10:23 +02:00
istos 152bbdd7f3 board: 10 → review (istos) 2026-07-30 14:34:51 +02:00
istos 3fed71246c board: 25 → to-do (istos) 2026-07-30 14:26:50 +02:00
istos 1f1cf3cc74 board: 28 → to-do (istos) 2026-07-30 14:26:45 +02:00
istos 63ddfe4b95 board: 27 → to-do (istos) 2026-07-30 14:26:43 +02:00
istos f2bd570f59 board: 10 → in-progress (istos) 2026-07-30 14:26:41 +02:00
istosandClaude Fable 5 ae9f10e3d0 Cards 27, 28: update offers to commit itself; a pinned port stays pinned
Both from the first downstream 0.2 update report: the vendored diff
left as homework in a clean-main workflow, and the TIME_WAIT port hop
that rewrote an explicit BOARD_PORT pin.

Co-Authored-By: Claude Fable 5 <noreply@anthropic.com>
2026-07-30 14:25:14 +02:00
istos f64afcfd92 board: 11 → done (istos) 2026-07-30 14:13:20 +02:00
istosandClaude Fable 5 c2cf1e92c0 Card 26: forge adapters — core stops speaking GitHub
Co-Authored-By: Claude Fable 5 <noreply@anthropic.com>
2026-07-30 14:12:06 +02:00
istos 780cdf97f4 board: 11 PR opened (istos) 2026-07-30 13:11:03 +02:00
istos 55a5d2a781 board: 11 → review (istos) 2026-07-30 13:10:55 +02:00