mirror of
https://github.com/SuperClaude-Org/SuperClaude_Framework.git
synced 2025-12-29 16:16:08 +00:00
- Core configuration files (CLAUDE.md, RULES.md, PERSONAS.md, MCP.md) - 17 slash commands for specialized workflows - 25 shared YAML resources for advanced configurations - Installation script for global deployment - 9 cognitive personas for specialized thinking modes - MCP integration patterns for intelligent tool usage - Token economy and ultracompressed mode support 🤖 Generated with [Claude Code](https://claude.ai/code) Co-Authored-By: Claude <noreply@anthropic.com>
3.0 KiB
3.0 KiB
Legend
| Symbol | Meaning | Abbrev | Meaning | |
|---|---|---|---|---|
| → | leads to | E2E | end-to-end | |
| & | and/with | deps | dependencies | |
| w/ | with | impl | implementation |
Execute immediately. Add --plan flag if user wants to see plan first.
Provide comprehensive time & complexity estimates for task in $ARGUMENTS.
Thinking flags (optional):
- --think→multi-component estimation w/ deps
- --think-hard→complex project estimation w/ risk analysis
- --ultrathink→enterprise-scale estimation w/ full uncertainty modeling
Examples:
/user:estimate --detailed --think- Detailed breakdown w/ dependency analysis/user:estimate --worst-case --think-hard- Risk-based estimation w/ comprehensive scenarios/user:estimate "migrate to microservices" --ultrathink- Complex architectural estimation
Relevant factors:
Time components:
- Dev time→impl | Code review & feedback cycles | Testing (unit, integration, E2E)
- Deployment & verification | Docs updates
Complexity multipliers:
- New feature from scratch: 1x baseline | Refactoring existing: 1.5x (understanding + changing)
- Working w/ legacy: 2x (constraints + unknowns) | Cross-team deps: 1.5x (coordination overhead)
Uncertainty factors:
- Clear requirements, known tech: ±10%
- Some unknowns, new patterns: ±25%
- Significant unknowns, research needed: ±50%
- Completely new territory: ±100%
Estimation workflow:
- Break down task into subtasks
- Estimate each subtask individually
- Apply complexity multipliers
- Add appropriate uncertainty buffer
- Provide a realistic range, not a single number
Formula: Base time × Complexity × Uncertainty = Time range
Include in estimates:
- Best case scenario (everything goes smoothly)
- Realistic case (normal friction and discoveries)
- Worst case scenario (significant obstacles)
Additional Considerations
Context factors:
- Developer experience level with the codebase
- Availability of documentation and examples
- Required coordination with other teams
- Potential blockers or dependencies
Research requirements for estimation:
- Technology patterns → Research implementation complexity via C7 and official docs
- Architecture patterns → WebSearch for similar project timelines and case studies
- Team velocity → Check historical data and industry benchmarks
- Risk assessment → Must verify common pitfalls and mitigation strategies
- Never estimate based on gut feeling - always research comparable scenarios
- All estimates must cite sources: // Source: [estimation data reference]
Report Output:
- Estimate summaries:
.claudedocs/summaries/estimate-<timestamp>.md - Risk assessments:
.claudedocs/reports/risk-analysis-<timestamp>.md - Ensure directory exists:
mkdir -p .claudedocs/summaries/ .claudedocs/reports/ - Include report location in output: "📄 Estimate saved to: [path]"
Deliverables: Time estimate range (min-max), complexity assessment, required resources, key assumptions, risk analysis, and potential blockers that could affect the estimate.