Commit Graph
4 Commits
Author SHA1 Message Date
SnapOtterandGitHub 37dc0098ba docs: sync API and documentation coverage (#379)
* docs: sync API and docs coverage

* ci: pin pandoc for sandboxed conversions
2026-06-29 22:35:05 +08:00
SnapOtterandGitHub c2ae334c81 fix(api): make OpenAPI spec ASCII-only so Schemathesis can load it (#344)
The nightly Schemathesis job failed with a schema-loading error:
'unacceptable character #x0080: control characters are not allowed'. The
served openapi.yaml contained 215 em dashes (U+2014) and box-drawing
section dividers (U+2500); Schemathesis's strict YAML parser mis-decodes
those multi-byte UTF-8 sequences as C1 control chars and refuses to load
the schema, so no fuzz checks ran. (PyYAML is lenient, which is why the
local yaml.safe_load check passed.)

Replace every non-ASCII char with ASCII '-'. This also clears an
em-dash style-rule violation. Add a docs.test.ts guard asserting the
served spec is ASCII-only, with a clear message, so this can't regress.

Pre-existing issue (the dashes predate this branch); surfaced while
verifying CI is green.
2026-06-24 17:14:10 +08:00
SnapOtter 5ffa1d55ea Merge branch 'worktree-test+suite-overhaul-and-real-fixtures' into chore/consolidate-v2.0.0
# Conflicts:
#	tests/integration/generated/settings-matrix.test.ts
#	tests/integration/platform/api.test.ts
#	tests/integration/platform/concurrent.test.ts
#	tests/integration/platform/factory-multi-input.test.ts
#	tests/integration/security/adversarial-comprehensive.test.ts
#	tests/integration/security/adversarial-coverage-gaps.test.ts
#	tests/integration/security/adversarial-extended.test.ts
#	tests/integration/security/adversarial-final-gaps.test.ts
#	tests/integration/security/adversarial-matrix.test.ts
#	tests/integration/security/adversarial-security.test.ts
#	tests/integration/security/adversarial.test.ts
#	tests/integration/tools/image/color-adjustments.test.ts
2026-06-21 02:18:53 +08:00
SnapOtter 1727a7a73e test: reorganize flat test files into purpose-based subdirectories (phase 6)
Group 245 flat integration tests and 25 loose unit tests into
discoverable subdirectories per spec section 6:

  integration/tools/{image,video,audio,document,data}/  (156 files)
  integration/platform/                                  (64 files)
  integration/generated/                                 (14 files)
  integration/security/                                  (10 files)

  unit/security/     (8 files, new subdir)
  unit/api/          (7 files moved in)
  unit/web/          (3 files moved in)
  unit/shared/       (6 files moved in)
  unit/image-engine/ (1 file moved in)

All moves via git mv (history preserved). Relative imports repaired
for both depth levels (platform/generated/security = +1, tools/ = +2):
static from-imports, dynamic import() calls, vi.mock() paths,
import.meta.dirname joins, and __dirname joins.

Vitest discovery unchanged (no test.include in config, recursive glob
matches subdirs, shard-by-hash unaffected). test-server.ts and
tool-route-drift.test.ts stay at integration root. fixtures/ untouched.

Parity gate: 13189 passing test names before = 13189 after (0 dropped).
2026-06-20 05:07:46 +08:00