# Change Management
|
||||
|
||||
Implement structured change management processes.
|
||||
Implement structured change management processes covering change classification, CAB workflows, emergency change procedures, and automation for compliance with SOC 2, ITIL, and regulatory frameworks.
|
||||
|
||||
## Change Process
|
||||
## When to Use
|
||||
|
||||
```yaml
|
||||
change_workflow:
|
||||
1_request:
|
||||
- Change description
|
||||
- Risk assessment
|
||||
- Rollback plan
|
||||
- Testing evidence
|
||||
|
||||
2_review:
|
||||
- Technical review
|
||||
- Security review
|
||||
- CAB approval (if high risk)
|
||||
|
||||
3_schedule:
|
||||
- Change window
|
||||
- Communication
|
||||
- Resource allocation
|
||||
|
||||
4_implement:
|
||||
- Execute change
|
||||
- Verify success
|
||||
- Update documentation
|
||||
|
||||
5_review:
|
||||
- Post-implementation review
|
||||
- Lessons learned
|
||||
```
|
||||
- Establishing change management processes for production environments
|
||||
- Implementing change advisory board (CAB) workflows
|
||||
- Defining change classification and approval requirements
|
||||
- Configuring automated change tracking in CI/CD pipelines
|
||||
- Handling emergency changes with proper controls and documentation
|
||||
|
||||
## Change Classification
|
||||
|
||||
| Type | Risk | Approval | Example |
|
||||
|------|------|----------|---------|
|
||||
| Standard | Low | Pre-approved | Patching |
|
||||
| Normal | Medium | Manager | Config change |
|
||||
| Emergency | Variable | Expedited | Security fix |
|
||||
```yaml
|
||||
change_types:
|
||||
standard:
|
||||
risk: Low
|
||||
approval: Pre-approved (no per-change approval needed)
|
||||
lead_time: None (within maintenance window)
|
||||
examples:
|
||||
- Routine patching within tested patch sets
|
||||
- Certificate rotation with established procedure
|
||||
- Scaling operations (adding/removing instances within limits)
|
||||
- Pre-approved configuration changes
|
||||
- Log rotation and archival
|
||||
requirements:
|
||||
- Change must match an approved Standard Change template
|
||||
- Automated testing must pass
|
||||
- Documented rollback procedure exists
|
||||
- Within defined maintenance window
|
||||
|
||||
## Pull Request Template
|
||||
normal_low:
|
||||
risk: Low
|
||||
approval: Peer review (1 approver)
|
||||
lead_time: 2 business days
|
||||
examples:
|
||||
- Non-critical configuration changes
|
||||
- Feature flag toggles
|
||||
- Documentation updates to production systems
|
||||
- Adding monitoring dashboards or alerts
|
||||
|
||||
normal_medium:
|
||||
risk: Medium
|
||||
approval: Team lead + peer review (2 approvers)
|
||||
lead_time: 5 business days
|
||||
examples:
|
||||
- Application deployments with new features
|
||||
- Database schema changes (non-breaking)
|
||||
- Network rule modifications
|
||||
- Integration endpoint changes
|
||||
- Dependency version upgrades
|
||||
|
||||
normal_high:
|
||||
risk: High
|
||||
approval: CAB review required
|
||||
lead_time: 10 business days
|
||||
examples:
|
||||
- Infrastructure migrations
|
||||
- Breaking database schema changes
|
||||
- Major version upgrades (OS, runtime, database engine)
|
||||
- Changes to authentication or authorization systems
|
||||
- Multi-service coordinated deployments
|
||||
- Changes affecting data processing or compliance controls
|
||||
|
||||
emergency:
|
||||
risk: Variable
|
||||
approval: Emergency CAB (minimum 2 approvers from on-call)
|
||||
lead_time: None (immediate implementation)
|
||||
examples:
|
||||
- Security vulnerability remediation (active exploitation)
|
||||
- Production outage resolution
|
||||
- Data integrity emergency fixes
|
||||
- Regulatory compliance deadline fixes
|
||||
requirements:
|
||||
- Retroactive full documentation within 48 hours
|
||||
- Post-implementation review required
|
||||
- CAB retroactive review at next meeting
|
||||
```
|
||||
|
||||
## Change Request Template
|
||||
|
||||
```yaml
|
||||
change_request:
|
||||
metadata:
|
||||
id: "CR-YYYY-NNNN"
|
||||
title: ""
|
||||
requestor: ""
|
||||
date_submitted: ""
|
||||
target_date: ""
|
||||
change_type: "" # standard | normal_low | normal_medium | normal_high | emergency
|
||||
|
||||
description:
|
||||
summary: "Brief description of the change"
|
||||
detailed_description: "Full technical details of what will change"
|
||||
business_justification: "Why this change is needed"
|
||||
affected_systems: []
|
||||
affected_services: []
|
||||
affected_users: "Description of user impact"
|
||||
|
||||
risk_assessment:
|
||||
risk_level: "" # low | medium | high
|
||||
impact_if_failed: "What happens if the change fails"
|
||||
likelihood_of_failure: "" # low | medium | high
|
||||
risk_mitigation: "Steps to reduce risk"
|
||||
dependencies: "Other systems or changes this depends on"
|
||||
|
||||
implementation:
|
||||
change_window:
|
||||
start: ""
|
||||
end: ""
|
||||
maintenance_window: true
|
||||
implementation_steps:
|
||||
- step: "Step 1 description"
|
||||
responsible: "Person/team"
|
||||
estimated_duration: "X minutes"
|
||||
- step: "Step 2 description"
|
||||
responsible: "Person/team"
|
||||
estimated_duration: "X minutes"
|
||||
|
||||
testing:
|
||||
pre_change_testing:
|
||||
- "Unit tests pass"
|
||||
- "Integration tests pass"
|
||||
- "Staging deployment verified"
|
||||
post_change_verification:
|
||||
- "Health check endpoints responding"
|
||||
- "Key transactions processing successfully"
|
||||
- "No error rate increase in monitoring"
|
||||
- "Performance metrics within baseline"
|
||||
|
||||
rollback:
|
||||
rollback_plan: "Detailed steps to revert the change"
|
||||
rollback_trigger: "Conditions that trigger rollback"
|
||||
rollback_estimated_time: "X minutes"
|
||||
rollback_steps:
|
||||
- "Step 1: Revert deployment to previous version"
|
||||
- "Step 2: Verify rollback successful"
|
||||
- "Step 3: Notify stakeholders"
|
||||
data_rollback: "Describe any data migration rollback needed"
|
||||
|
||||
communication:
|
||||
stakeholders_notified: []
|
||||
notification_sent_date: ""
|
||||
status_page_update: true
|
||||
customer_notification_required: false
|
||||
|
||||
approvals:
|
||||
technical_reviewer: ""
|
||||
technical_approval_date: ""
|
||||
security_reviewer: ""
|
||||
security_approval_date: ""
|
||||
cab_approval_date: ""
|
||||
cab_notes: ""
|
||||
|
||||
closure:
|
||||
implementation_date: ""
|
||||
implementation_result: "" # success | partial | failed | rolled_back
|
||||
post_implementation_review: ""
|
||||
lessons_learned: ""
|
||||
follow_up_actions: []
|
||||
```
|
||||
|
||||
## CAB Workflow
|
||||
|
||||
```yaml
|
||||
cab_workflow:
|
||||
meeting_schedule:
|
||||
regular_cab: "Weekly, Thursday 2:00 PM"
|
||||
emergency_cab: "On-demand, minimum 2 members required"
|
||||
|
||||
cab_members:
|
||||
permanent:
|
||||
- Engineering Manager (Chair)
|
||||
- Security Team Representative
|
||||
- Infrastructure/SRE Lead
|
||||
- Release Manager
|
||||
advisory:
|
||||
- Business stakeholder (invited per change)
|
||||
- Database administrator (for DB changes)
|
||||
- Network engineer (for network changes)
|
||||
|
||||
agenda:
|
||||
1: "Review emergency changes from prior week"
|
||||
2: "Review high-risk change requests for upcoming window"
|
||||
3: "Review failed changes and lessons learned"
|
||||
4: "Discuss upcoming change freeze periods"
|
||||
5: "Review change metrics and trends"
|
||||
|
||||
decision_criteria:
|
||||
approve_when:
|
||||
- Risk assessment is complete and accurate
|
||||
- Testing evidence is provided
|
||||
- Rollback plan is documented and feasible
|
||||
- Change window is appropriate
|
||||
- Required approvals obtained
|
||||
- No conflicts with other scheduled changes
|
||||
request_changes_when:
|
||||
- Rollback plan is missing or incomplete
|
||||
- Testing is insufficient for the risk level
|
||||
- Impact assessment needs clarification
|
||||
- Change conflicts with another scheduled change
|
||||
deny_when:
|
||||
- Risk is unacceptable without mitigation
|
||||
- Change window conflicts with freeze period
|
||||
- Dependencies are not resolved
|
||||
- Compliance concerns are unaddressed
|
||||
```
|
||||
|
||||
## Emergency Change Procedure
|
||||
|
||||
```yaml
|
||||
emergency_change_process:
|
||||
definition: "A change required to restore service or prevent imminent security compromise"
|
||||
|
||||
step_1_declare:
|
||||
actions:
|
||||
- On-call engineer identifies need for emergency change
|
||||
- Incident commander approves emergency classification
|
||||
- Minimum 2 approvers from emergency CAB roster contacted
|
||||
- Document initial justification in incident channel
|
||||
|
||||
step_2_approve:
|
||||
approval_method:
|
||||
- Slack/Teams approval with screenshots preserved
|
||||
- Verbal approval over bridge call (documented in notes)
|
||||
- Emergency approvers can be any 2 of the following roles:
|
||||
- Engineering Manager
|
||||
- SRE/Infrastructure Lead
|
||||
- Security Team Lead
|
||||
- VP of Engineering
|
||||
timeout: "If no response in 15 minutes, escalate to next tier"
|
||||
|
||||
step_3_implement:
|
||||
actions:
|
||||
- Implement the minimum change needed to resolve the issue
|
||||
- Record all actions taken with timestamps
|
||||
- Monitor for successful resolution
|
||||
- Document any deviations from planned change
|
||||
|
||||
step_4_verify:
|
||||
actions:
|
||||
- Confirm service restoration
|
||||
- Verify no unintended side effects
|
||||
- Run post-change verification checks
|
||||
- Update status page and stakeholders
|
||||
|
||||
step_5_document:
|
||||
deadline: "Within 48 hours of implementation"
|
||||
required_documentation:
|
||||
- Complete change request form (retroactive)
|
||||
- Timeline of events and actions
|
||||
- Justification for emergency classification
|
||||
- Approval records (messages, emails)
|
||||
- Post-implementation verification results
|
||||
- Root cause analysis (what made it an emergency)
|
||||
- Preventive actions to avoid future emergency
|
||||
|
||||
step_6_review:
|
||||
actions:
|
||||
- CAB review at next regular meeting
|
||||
- Assess if emergency classification was appropriate
|
||||
- Identify process improvements
|
||||
- Track emergency change trends
|
||||
```
|
||||
|
||||
## Pull Request Template for Changes
|
||||
|
||||
```markdown
|
||||
## Change Description
|
||||
## Change Request
|
||||
|
||||
## Risk Level
|
||||
- [ ] Low - Standard change
|
||||
- [ ] Medium - Normal change
|
||||
- [ ] High - CAB required
|
||||
### Type
|
||||
- [ ] Standard (pre-approved, low risk)
|
||||
- [ ] Normal - Low Risk
|
||||
- [ ] Normal - Medium Risk
|
||||
- [ ] Normal - High Risk (CAB required)
|
||||
- [ ] Emergency (retroactive documentation required)
|
||||
|
||||
## Testing
|
||||
### Description
|
||||
<!-- What is being changed and why? -->
|
||||
|
||||
### Risk Assessment
|
||||
**Impact if failed:** <!-- What breaks? -->
|
||||
**Likelihood of failure:** Low / Medium / High
|
||||
**Affected services:** <!-- List services -->
|
||||
**User impact:** <!-- Will users notice? -->
|
||||
|
||||
### Testing Evidence
|
||||
- [ ] Unit tests pass
|
||||
- [ ] Integration tests pass
|
||||
- [ ] Staging deployment verified
|
||||
- [ ] Performance test completed (if applicable)
|
||||
- [ ] Security scan clean (if applicable)
|
||||
|
||||
## Rollback Plan
|
||||
### Rollback Plan
|
||||
<!-- How to revert if something goes wrong -->
|
||||
**Estimated rollback time:** <!-- X minutes -->
|
||||
**Data rollback needed:** Yes / No
|
||||
|
||||
## Stakeholders Notified
|
||||
- [ ] Operations
|
||||
- [ ] Security
|
||||
- [ ] Business owners
|
||||
### Deployment Plan
|
||||
**Target window:** <!-- Date and time -->
|
||||
**Estimated duration:** <!-- X minutes -->
|
||||
|
||||
### Post-Deployment Verification
|
||||
- [ ] Health checks passing
|
||||
- [ ] Error rates within baseline
|
||||
- [ ] Key transactions working
|
||||
- [ ] Monitoring dashboards reviewed
|
||||
|
||||
### Communication
|
||||
- [ ] Team notified
|
||||
- [ ] Stakeholders notified (if user-facing)
|
||||
- [ ] Status page updated (if applicable)
|
||||
|
||||
### Approvals Required
|
||||
- [ ] Peer review
|
||||
- [ ] Team lead (medium+ risk)
|
||||
- [ ] Security review (security-impacting changes)
|
||||
- [ ] CAB approval (high risk)
|
||||
```
|
||||
|
||||
## CI/CD Change Tracking Automation
|
||||
|
||||
```yaml
|
||||
# GitHub Actions - Automated change tracking
|
||||
name: Change Management
|
||||
on:
|
||||
pull_request:
|
||||
types: [opened, synchronize, labeled]
|
||||
push:
|
||||
branches: [main]
|
||||
|
||||
jobs:
|
||||
classify-change:
|
||||
if: github.event_name == 'pull_request'
|
||||
runs-on: ubuntu-latest
|
||||
steps:
|
||||
- uses: actions/checkout@v4
|
||||
|
||||
- name: Classify change risk
|
||||
id: classify
|
||||
run: |
|
||||
FILES_CHANGED=$(gh pr diff ${{ github.event.pull_request.number }} --name-only)
|
||||
|
||||
# High risk indicators
|
||||
if echo "$FILES_CHANGED" | grep -qE 'terraform/|infrastructure/|migrations/|auth/|security/'; then
|
||||
echo "risk=high" >> $GITHUB_OUTPUT
|
||||
echo "::warning::High-risk change detected - CAB review may be required"
|
||||
elif echo "$FILES_CHANGED" | grep -qE 'config/|database/|api/'; then
|
||||
echo "risk=medium" >> $GITHUB_OUTPUT
|
||||
else
|
||||
echo "risk=low" >> $GITHUB_OUTPUT
|
||||
fi
|
||||
env:
|
||||
GH_TOKEN: ${{ secrets.GITHUB_TOKEN }}
|
||||
|
||||
- name: Add risk label
|
||||
run: |
|
||||
gh pr edit ${{ github.event.pull_request.number }} \
|
||||
--add-label "risk:${{ steps.classify.outputs.risk }}"
|
||||
env:
|
||||
GH_TOKEN: ${{ secrets.GITHUB_TOKEN }}
|
||||
|
||||
- name: Enforce approvals by risk
|
||||
if: steps.classify.outputs.risk == 'high'
|
||||
run: |
|
||||
APPROVALS=$(gh pr view ${{ github.event.pull_request.number }} \
|
||||
--json reviews --jq '[.reviews[] | select(.state=="APPROVED")] | length')
|
||||
if [ "$APPROVALS" -lt 2 ]; then
|
||||
echo "::error::High-risk changes require at least 2 approvals"
|
||||
exit 1
|
||||
fi
|
||||
env:
|
||||
GH_TOKEN: ${{ secrets.GITHUB_TOKEN }}
|
||||
|
||||
record-deployment:
|
||||
if: github.event_name == 'push' && github.ref == 'refs/heads/main'
|
||||
runs-on: ubuntu-latest
|
||||
steps:
|
||||
- name: Record deployment
|
||||
run: |
|
||||
CHANGE_ID="CR-$(date +%Y)-$(printf '%04d' ${{ github.run_number }})"
|
||||
echo "Change ID: $CHANGE_ID"
|
||||
echo "Deployed at: $(date -u +%Y-%m-%dT%H:%M:%SZ)"
|
||||
echo "Commit: ${{ github.sha }}"
|
||||
echo "Author: ${{ github.actor }}"
|
||||
|
||||
cat > /tmp/deployment-record.json <<EOF
|
||||
{
|
||||
"change_id": "$CHANGE_ID",
|
||||
"timestamp": "$(date -u +%Y-%m-%dT%H:%M:%SZ)",
|
||||
"commit": "${{ github.sha }}",
|
||||
"author": "${{ github.actor }}",
|
||||
"environment": "production",
|
||||
"status": "deployed"
|
||||
}
|
||||
EOF
|
||||
```
|
||||
|
||||
## Change Freeze Policy
|
||||
|
||||
```yaml
|
||||
change_freeze:
|
||||
definition: "Period during which non-emergency changes are prohibited"
|
||||
|
||||
scheduled_freezes:
|
||||
year_end:
|
||||
start: "December 15"
|
||||
end: "January 3"
|
||||
scope: "All production changes"
|
||||
major_events:
|
||||
- "Black Friday through Cyber Monday (e-commerce)"
|
||||
- "Tax filing deadline periods (financial services)"
|
||||
- "Open enrollment periods (healthcare)"
|
||||
|
||||
exceptions_during_freeze:
|
||||
allowed:
|
||||
- Security patches for actively exploited vulnerabilities
|
||||
- Changes required by regulatory deadline
|
||||
- Fixes for P1/SEV1 production incidents
|
||||
approval: "VP of Engineering + Security Lead"
|
||||
|
||||
communication:
|
||||
announcement: "2 weeks before freeze"
|
||||
reminder: "1 week and 1 day before freeze"
|
||||
daily_status: "During freeze period"
|
||||
lift_notification: "When freeze ends"
|
||||
```
|
||||
|
||||
## Change Management Metrics
|
||||
|
||||
```yaml
|
||||
metrics:
|
||||
change_success_rate:
|
||||
description: "Percentage of changes implemented without rollback or incident"
|
||||
target: ">95%"
|
||||
formula: "(successful changes / total changes) * 100"
|
||||
|
||||
emergency_change_rate:
|
||||
description: "Percentage of changes classified as emergency"
|
||||
target: "<5%"
|
||||
formula: "(emergency changes / total changes) * 100"
|
||||
|
||||
rollback_rate:
|
||||
description: "Percentage of changes that required rollback"
|
||||
target: "<3%"
|
||||
|
||||
mean_time_to_implement:
|
||||
description: "Average time from approval to implementation"
|
||||
target: "Varies by type"
|
||||
|
||||
cab_approval_time:
|
||||
description: "Average time from submission to CAB decision"
|
||||
target: "<5 business days for normal changes"
|
||||
```
|
||||
|
||||
## Change Management Checklist
|
||||
|
||||
```yaml
|
||||
change_management_checklist:
|
||||
process_setup:
|
||||
- [ ] Change types defined with classification criteria
|
||||
- [ ] Approval matrix documented (who approves what)
|
||||
- [ ] CAB established with regular meeting schedule
|
||||
- [ ] Emergency change procedure documented
|
||||
- [ ] Change request template created
|
||||
- [ ] Change freeze policy defined
|
||||
|
||||
tooling:
|
||||
- [ ] PR template includes change management fields
|
||||
- [ ] Automated risk classification in CI/CD
|
||||
- [ ] Branch protection enforces required approvals
|
||||
- [ ] Deployment records captured automatically
|
||||
- [ ] Change audit trail preserved (PR history, approvals)
|
||||
|
||||
compliance:
|
||||
- [ ] All production changes have documented approval
|
||||
- [ ] Rollback plans exist for every change
|
||||
- [ ] Post-implementation reviews conducted for failures
|
||||
- [ ] Emergency changes documented retroactively within 48 hours
|
||||
- [ ] Change metrics reported monthly
|
||||
- [ ] Audit trail retained for compliance period (1-3 years)
|
||||
```
|
||||
|
||||
## Best Practices
|
||||
|
||||
- Clear change categories
|
||||
- Required approvals by risk
|
||||
- Rollback procedures documented
|
||||
- Post-change verification
|
||||
- Change freeze windows
|
||||
- Classify changes by risk level to apply proportionate controls without slowing low-risk work
|
||||
- Automate risk classification based on files changed, services affected, and deployment scope
|
||||
- Use PR approvals as the native change approval mechanism for code-driven changes
|
||||
- Require rollback plans for every change and test rollback procedures periodically
|
||||
- Track emergency changes as a key metric: a high rate indicates systemic process issues
|
||||
- Implement change freezes during critical business periods to protect stability
|
||||
- Conduct post-implementation reviews for all failed changes to drive improvement
|
||||
- Separate duty of implementation from duty of approval (no self-approving changes)
|
||||
- Capture deployment records automatically in CI/CD rather than relying on manual entry
|
||||
- Keep the CAB focused on high-risk decisions; do not bottleneck low-risk changes through CAB
|
||||
|
||||