mirror of
https://github.com/bmadcode/BMAD-METHOD.git
synced 2025-12-29 16:14:59 +00:00
refactor: Major v6 epic creation improvements and documentation overhaul
## Key Changes ### 1. Epic Creation Workflow Enhancements - Added user-value focused epic structure principles (NO technical layer breakdown) - Implemented multi-mode detection: CONTINUE, REPLACE, or UPDATE existing epics - Added comprehensive anti-pattern examples showing wrong vs right epic breakdown - Epics now created AFTER architecture for technically-informed story breakdown - Added checkpoint protocol for interactive workflow progression ### 2. Removed Deprecated Solutioning Gate Check - Deleted entire solutioning-gate-check workflow (682 lines) - Replaced by new implementation-readiness workflow - Cleaner separation of concerns in solutioning phase ### 3. PRD Template Simplification - Removed hardcoded "Implementation Planning", "References", and "Next Steps" sections - PRD now focuses purely on requirements, not workflow orchestration - Epics/stories created as separate step after architecture ### 4. Documentation Overhaul (15+ docs updated) - Updated quick-start guide with v6 workflow sequence - Clarified that epics are created AFTER architecture, not during PRD - Updated solutioning docs to reflect implementation-readiness pattern - Improved agents-guide, brownfield-guide, enterprise docs - Enhanced glossary, FAQ, and workflow reference documentation ### 5. Workflow Path Adjustments - All 4 paths updated (enterprise/method × brownfield/greenfield) - Version bumps across BMGD, BMM, and CIS workflow YAMLs - Minor instruction file updates for consistency ### Files Changed - 65 files total: 468 insertions, 978 deletions (net reduction of 510 lines) - 4 files deleted (entire solutioning-gate-check workflow) - 1 new directory added (implementation-readiness placeholder)
This commit is contained in:
@@ -18,21 +18,23 @@ TEA integrates into the BMad development lifecycle during Solutioning (Phase 3)
|
||||
%%{init: {'theme':'base', 'themeVariables': { 'primaryColor':'#fff','primaryTextColor':'#000','primaryBorderColor':'#000','lineColor':'#000','secondaryColor':'#fff','tertiaryColor':'#fff','fontSize':'16px','fontFamily':'arial'}}}%%
|
||||
graph TB
|
||||
subgraph Phase2["<b>Phase 2: PLANNING</b>"]
|
||||
PM["<b>PM: *prd (creates PRD + epics)</b>"]
|
||||
PM["<b>PM: *prd (creates PRD with FRs/NFRs)</b>"]
|
||||
PlanNote["<b>Business requirements phase</b>"]
|
||||
PM -.-> PlanNote
|
||||
end
|
||||
|
||||
subgraph Phase3["<b>Phase 3: SOLUTIONING</b>"]
|
||||
Architecture["<b>Architect: *architecture</b>"]
|
||||
EpicsStories["<b>PM/Architect: *create-epics-and-stories</b>"]
|
||||
Framework["<b>TEA: *framework</b>"]
|
||||
CI["<b>TEA: *ci</b>"]
|
||||
GateCheck["<b>Architect: *solutioning-gate-check</b>"]
|
||||
Architecture --> Framework
|
||||
GateCheck["<b>Architect: *implementation-readiness</b>"]
|
||||
Architecture --> EpicsStories
|
||||
EpicsStories --> Framework
|
||||
Framework --> CI
|
||||
CI --> GateCheck
|
||||
Phase3Note["<b>Test infrastructure AFTER architecture</b><br/>defines technology stack"]
|
||||
Framework -.-> Phase3Note
|
||||
Phase3Note["<b>Epics created AFTER architecture,</b><br/><b>then test infrastructure setup</b>"]
|
||||
EpicsStories -.-> Phase3Note
|
||||
end
|
||||
|
||||
subgraph Phase4["<b>Phase 4: IMPLEMENTATION - Per Epic Cycle</b>"]
|
||||
@@ -90,8 +92,8 @@ graph TB
|
||||
|
||||
- **Phase 0** (Optional): Documentation (brownfield prerequisite - `*document-project`)
|
||||
- **Phase 1** (Optional): Discovery/Analysis (`*brainstorm`, `*research`, `*product-brief`)
|
||||
- **Phase 2** (Required): Planning (`*prd` creates PRD + epics)
|
||||
- **Phase 3** (Track-dependent): Solutioning (`*architecture` → TEA: `*framework`, `*ci` → `*solutioning-gate-check`)
|
||||
- **Phase 2** (Required): Planning (`*prd` creates PRD with FRs/NFRs)
|
||||
- **Phase 3** (Track-dependent): Solutioning (`*architecture` → `*create-epics-and-stories` → TEA: `*framework`, `*ci` → `*implementation-readiness`)
|
||||
- **Phase 4** (Required): Implementation (`*sprint-planning` → per-epic: `*test-design` → per-story: dev workflows)
|
||||
|
||||
**TEA workflows:** `*framework` and `*ci` run once in Phase 3 after architecture. `*test-design` runs per-epic in Phase 4. Output: `test-design-epic-N.md`.
|
||||
@@ -191,16 +193,16 @@ These cheat sheets map TEA workflows to the **BMad Method and Enterprise tracks*
|
||||
**Planning Track:** BMad Method (PRD + Architecture)
|
||||
**Use Case:** New projects with standard complexity
|
||||
|
||||
| Workflow Stage | Test Architect | Dev / Team | Outputs |
|
||||
| -------------------------- | ----------------------------------------------------------------- | ---------------------------------------------------- | ---------------------------------------------------------- |
|
||||
| **Phase 1**: Discovery | - | Analyst `*product-brief` (optional) | `product-brief.md` |
|
||||
| **Phase 2**: Planning | - | PM `*prd` (creates PRD + epics) | PRD, epics |
|
||||
| **Phase 3**: Solutioning | Run `*framework`, `*ci` AFTER architecture | Architect `*architecture`, `*solutioning-gate-check` | Architecture, test scaffold, CI pipeline |
|
||||
| **Phase 4**: Sprint Start | - | SM `*sprint-planning` | Sprint status file with all epics and stories |
|
||||
| **Phase 4**: Epic Planning | Run `*test-design` for THIS epic (per-epic test plan) | Review epic scope | `test-design-epic-N.md` with risk assessment and test plan |
|
||||
| **Phase 4**: Story Dev | (Optional) `*atdd` before dev, then `*automate` after | SM `*create-story`, DEV implements | Tests, story implementation |
|
||||
| **Phase 4**: Story Review | Execute `*test-review` (optional), re-run `*trace` | Address recommendations, update code/tests | Quality report, refreshed coverage matrix |
|
||||
| **Phase 4**: Release Gate | (Optional) `*test-review` for final audit, Run `*trace` (Phase 2) | Confirm Definition of Done, share release notes | Quality audit, Gate YAML + release summary |
|
||||
| Workflow Stage | Test Architect | Dev / Team | Outputs |
|
||||
| -------------------------- | ----------------------------------------------------------------- | ----------------------------------------------------------------------------------- | ---------------------------------------------------------- |
|
||||
| **Phase 1**: Discovery | - | Analyst `*product-brief` (optional) | `product-brief.md` |
|
||||
| **Phase 2**: Planning | - | PM `*prd` (creates PRD with FRs/NFRs) | PRD with functional/non-functional requirements |
|
||||
| **Phase 3**: Solutioning | Run `*framework`, `*ci` AFTER architecture and epic creation | Architect `*architecture`, `*create-epics-and-stories`, `*implementation-readiness` | Architecture, epics/stories, test scaffold, CI pipeline |
|
||||
| **Phase 4**: Sprint Start | - | SM `*sprint-planning` | Sprint status file with all epics and stories |
|
||||
| **Phase 4**: Epic Planning | Run `*test-design` for THIS epic (per-epic test plan) | Review epic scope | `test-design-epic-N.md` with risk assessment and test plan |
|
||||
| **Phase 4**: Story Dev | (Optional) `*atdd` before dev, then `*automate` after | SM `*create-story`, DEV implements | Tests, story implementation |
|
||||
| **Phase 4**: Story Review | Execute `*test-review` (optional), re-run `*trace` | Address recommendations, update code/tests | Quality report, refreshed coverage matrix |
|
||||
| **Phase 4**: Release Gate | (Optional) `*test-review` for final audit, Run `*trace` (Phase 2) | Confirm Definition of Done, share release notes | Quality audit, Gate YAML + release summary |
|
||||
|
||||
<details>
|
||||
<summary>Execution Notes</summary>
|
||||
@@ -218,8 +220,8 @@ These cheat sheets map TEA workflows to the **BMad Method and Enterprise tracks*
|
||||
<details>
|
||||
<summary>Worked Example – “Nova CRM” Greenfield Feature</summary>
|
||||
|
||||
1. **Planning (Phase 2):** Analyst runs `*product-brief`; PM executes `*prd` to produce PRD and epics.
|
||||
2. **Solutioning (Phase 3):** Architect completes `*architecture` for the new module; TEA sets up test infrastructure via `*framework` and `*ci` based on architectural decisions; gate check validates planning completeness.
|
||||
1. **Planning (Phase 2):** Analyst runs `*product-brief`; PM executes `*prd` to produce PRD with FRs/NFRs.
|
||||
2. **Solutioning (Phase 3):** Architect completes `*architecture` for the new module; `*create-epics-and-stories` generates epics/stories based on architecture; TEA sets up test infrastructure via `*framework` and `*ci` based on architectural decisions; gate check validates planning completeness.
|
||||
3. **Sprint Start (Phase 4):** Scrum Master runs `*sprint-planning` to load all epics into sprint status.
|
||||
4. **Epic 1 Planning (Phase 4):** TEA runs `*test-design` to create test plan for Epic 1, producing `test-design-epic-1.md` with risk assessment.
|
||||
5. **Story Implementation (Phase 4):** For each story in Epic 1, SM generates story via `*create-story`; TEA optionally runs `*atdd`; Dev implements with guidance from failing tests.
|
||||
@@ -240,17 +242,17 @@ These cheat sheets map TEA workflows to the **BMad Method and Enterprise tracks*
|
||||
- 🔄 Phase 4: `*test-design` - Focus on regression hotspots and brownfield risks
|
||||
- 🔄 Phase 4: Story Review - May include `*nfr-assess` if not done earlier
|
||||
|
||||
| Workflow Stage | Test Architect | Dev / Team | Outputs |
|
||||
| ----------------------------- | ---------------------------------------------------------------------------- | ---------------------------------------------------- | ---------------------------------------------------------------------- |
|
||||
| **Phase 0**: Documentation ➕ | - | Analyst `*document-project` (if undocumented) | Comprehensive project documentation |
|
||||
| **Phase 1**: Discovery | - | Analyst/PM/Architect rerun planning workflows | Updated planning artifacts in `{output_folder}` |
|
||||
| **Phase 2**: Planning | Run ➕ `*trace` (baseline coverage) | PM `*prd` (creates PRD + epics) | PRD, epics, ➕ coverage baseline |
|
||||
| **Phase 3**: Solutioning | Run `*framework`, `*ci` AFTER architecture | Architect `*architecture`, `*solutioning-gate-check` | Architecture, test framework, CI pipeline |
|
||||
| **Phase 4**: Sprint Start | - | SM `*sprint-planning` | Sprint status file with all epics and stories |
|
||||
| **Phase 4**: Epic Planning | Run `*test-design` for THIS epic 🔄 (regression hotspots) | Review epic scope and brownfield risks | `test-design-epic-N.md` with brownfield risk assessment and mitigation |
|
||||
| **Phase 4**: Story Dev | (Optional) `*atdd` before dev, then `*automate` after | SM `*create-story`, DEV implements | Tests, story implementation |
|
||||
| **Phase 4**: Story Review | Apply `*test-review` (optional), re-run `*trace`, ➕ `*nfr-assess` if needed | Resolve gaps, update docs/tests | Quality report, refreshed coverage matrix, NFR report |
|
||||
| **Phase 4**: Release Gate | (Optional) `*test-review` for final audit, Run `*trace` (Phase 2) | Capture sign-offs, share release notes | Quality audit, Gate YAML + release summary |
|
||||
| Workflow Stage | Test Architect | Dev / Team | Outputs |
|
||||
| ----------------------------- | ---------------------------------------------------------------------------- | ----------------------------------------------------------------------------------- | ---------------------------------------------------------------------- |
|
||||
| **Phase 0**: Documentation ➕ | - | Analyst `*document-project` (if undocumented) | Comprehensive project documentation |
|
||||
| **Phase 1**: Discovery | - | Analyst/PM/Architect rerun planning workflows | Updated planning artifacts in `{output_folder}` |
|
||||
| **Phase 2**: Planning | Run ➕ `*trace` (baseline coverage) | PM `*prd` (creates PRD with FRs/NFRs) | PRD with FRs/NFRs, ➕ coverage baseline |
|
||||
| **Phase 3**: Solutioning | Run `*framework`, `*ci` AFTER architecture and epic creation | Architect `*architecture`, `*create-epics-and-stories`, `*implementation-readiness` | Architecture, epics/stories, test framework, CI pipeline |
|
||||
| **Phase 4**: Sprint Start | - | SM `*sprint-planning` | Sprint status file with all epics and stories |
|
||||
| **Phase 4**: Epic Planning | Run `*test-design` for THIS epic 🔄 (regression hotspots) | Review epic scope and brownfield risks | `test-design-epic-N.md` with brownfield risk assessment and mitigation |
|
||||
| **Phase 4**: Story Dev | (Optional) `*atdd` before dev, then `*automate` after | SM `*create-story`, DEV implements | Tests, story implementation |
|
||||
| **Phase 4**: Story Review | Apply `*test-review` (optional), re-run `*trace`, ➕ `*nfr-assess` if needed | Resolve gaps, update docs/tests | Quality report, refreshed coverage matrix, NFR report |
|
||||
| **Phase 4**: Release Gate | (Optional) `*test-review` for final audit, Run `*trace` (Phase 2) | Capture sign-offs, share release notes | Quality audit, Gate YAML + release summary |
|
||||
|
||||
<details>
|
||||
<summary>Execution Notes</summary>
|
||||
@@ -268,8 +270,8 @@ These cheat sheets map TEA workflows to the **BMad Method and Enterprise tracks*
|
||||
<details>
|
||||
<summary>Worked Example – “Atlas Payments” Brownfield Story</summary>
|
||||
|
||||
1. **Planning (Phase 2):** PM executes `*prd` to update PRD and `epics.md` (Epic 1: Payment Processing); TEA runs `*trace` to baseline existing coverage.
|
||||
2. **Solutioning (Phase 3):** Architect triggers `*architecture` capturing legacy payment flows and integration architecture; TEA sets up `*framework` and `*ci` based on architectural decisions; gate check validates planning.
|
||||
1. **Planning (Phase 2):** PM executes `*prd` to create PRD with FRs/NFRs; TEA runs `*trace` to baseline existing coverage.
|
||||
2. **Solutioning (Phase 3):** Architect triggers `*architecture` capturing legacy payment flows and integration architecture; `*create-epics-and-stories` generates Epic 1 (Payment Processing) based on architecture; TEA sets up `*framework` and `*ci` based on architectural decisions; gate check validates planning.
|
||||
3. **Sprint Start (Phase 4):** Scrum Master runs `*sprint-planning` to load Epic 1 into sprint status.
|
||||
4. **Epic 1 Planning (Phase 4):** TEA runs `*test-design` for Epic 1 (Payment Processing), producing `test-design-epic-1.md` that flags settlement edge cases, regression hotspots, and mitigation plans.
|
||||
5. **Story Implementation (Phase 4):** For each story in Epic 1, SM generates story via `*create-story`; TEA runs `*atdd` producing failing Playwright specs; Dev implements with guidance from tests and checklist.
|
||||
@@ -290,15 +292,15 @@ These cheat sheets map TEA workflows to the **BMad Method and Enterprise tracks*
|
||||
- 🔄 Phase 4: `*test-design` - Enterprise focus (compliance, security architecture alignment)
|
||||
- 📦 Release Gate - Archive artifacts and compliance evidence for audits
|
||||
|
||||
| Workflow Stage | Test Architect | Dev / Team | Outputs |
|
||||
| -------------------------- | ------------------------------------------------------------------------ | ---------------------------------------------------- | ------------------------------------------------------------------ |
|
||||
| **Phase 1**: Discovery | - | Analyst ➕ `*research`, `*product-brief` | Domain research, compliance analysis, product brief |
|
||||
| **Phase 2**: Planning | Run ➕ `*nfr-assess` | PM `*prd` (creates PRD + epics), UX `*create-design` | Enterprise PRD, epics, UX design, ➕ NFR documentation |
|
||||
| **Phase 3**: Solutioning | Run `*framework`, `*ci` AFTER architecture | Architect `*architecture`, `*solutioning-gate-check` | Architecture, test framework, CI pipeline |
|
||||
| **Phase 4**: Sprint Start | - | SM `*sprint-planning` | Sprint plan with all epics |
|
||||
| **Phase 4**: Epic Planning | Run `*test-design` for THIS epic 🔄 (compliance focus) | Review epic scope and compliance requirements | `test-design-epic-N.md` with security/performance/compliance focus |
|
||||
| **Phase 4**: Story Dev | (Optional) `*atdd`, `*automate`, `*test-review`, `*trace` per story | SM `*create-story`, DEV implements | Tests, fixtures, quality reports, coverage matrices |
|
||||
| **Phase 4**: Release Gate | Final `*test-review` audit, Run `*trace` (Phase 2), 📦 archive artifacts | Capture sign-offs, 📦 compliance evidence | Quality audit, updated assessments, gate YAML, 📦 audit trail |
|
||||
| Workflow Stage | Test Architect | Dev / Team | Outputs |
|
||||
| -------------------------- | ------------------------------------------------------------------------ | ----------------------------------------------------------------------------------- | ------------------------------------------------------------------ |
|
||||
| **Phase 1**: Discovery | - | Analyst ➕ `*research`, `*product-brief` | Domain research, compliance analysis, product brief |
|
||||
| **Phase 2**: Planning | Run ➕ `*nfr-assess` | PM `*prd` (creates PRD with FRs/NFRs), UX `*create-design` | Enterprise PRD with FRs/NFRs, UX design, ➕ NFR documentation |
|
||||
| **Phase 3**: Solutioning | Run `*framework`, `*ci` AFTER architecture and epic creation | Architect `*architecture`, `*create-epics-and-stories`, `*implementation-readiness` | Architecture, epics/stories, test framework, CI pipeline |
|
||||
| **Phase 4**: Sprint Start | - | SM `*sprint-planning` | Sprint plan with all epics |
|
||||
| **Phase 4**: Epic Planning | Run `*test-design` for THIS epic 🔄 (compliance focus) | Review epic scope and compliance requirements | `test-design-epic-N.md` with security/performance/compliance focus |
|
||||
| **Phase 4**: Story Dev | (Optional) `*atdd`, `*automate`, `*test-review`, `*trace` per story | SM `*create-story`, DEV implements | Tests, fixtures, quality reports, coverage matrices |
|
||||
| **Phase 4**: Release Gate | Final `*test-review` audit, Run `*trace` (Phase 2), 📦 archive artifacts | Capture sign-offs, 📦 compliance evidence | Quality audit, updated assessments, gate YAML, 📦 audit trail |
|
||||
|
||||
<details>
|
||||
<summary>Execution Notes</summary>
|
||||
@@ -316,8 +318,8 @@ These cheat sheets map TEA workflows to the **BMad Method and Enterprise tracks*
|
||||
<details>
|
||||
<summary>Worked Example – “Helios Ledger” Enterprise Release</summary>
|
||||
|
||||
1. **Planning (Phase 2):** Analyst runs `*research` and `*product-brief`; PM completes `*prd` creating PRD and epics; TEA runs `*nfr-assess` to establish NFR targets.
|
||||
2. **Solutioning (Phase 3):** Architect completes `*architecture` with enterprise considerations; TEA sets up `*framework` and `*ci` with enterprise-grade configurations based on architectural decisions; gate check validates planning completeness.
|
||||
1. **Planning (Phase 2):** Analyst runs `*research` and `*product-brief`; PM completes `*prd` creating PRD with FRs/NFRs; TEA runs `*nfr-assess` to establish NFR targets.
|
||||
2. **Solutioning (Phase 3):** Architect completes `*architecture` with enterprise considerations; `*create-epics-and-stories` generates epics/stories based on architecture; TEA sets up `*framework` and `*ci` with enterprise-grade configurations based on architectural decisions; gate check validates planning completeness.
|
||||
3. **Sprint Start (Phase 4):** Scrum Master runs `*sprint-planning` to load all epics into sprint status.
|
||||
4. **Per-Epic (Phase 4):** For each epic, TEA runs `*test-design` to create epic-specific test plan (e.g., `test-design-epic-1.md`, `test-design-epic-2.md`) with compliance-focused risk assessment.
|
||||
5. **Per-Story (Phase 4):** For each story, TEA uses `*atdd`, `*automate`, `*test-review`, and `*trace`; Dev teams iterate on the findings.
|
||||
|
||||
Reference in New Issue
Block a user