refactor: Major v6 epic creation improvements and documentation overhaul

## Key Changes

### 1. Epic Creation Workflow Enhancements
- Added user-value focused epic structure principles (NO technical layer breakdown)
- Implemented multi-mode detection: CONTINUE, REPLACE, or UPDATE existing epics
- Added comprehensive anti-pattern examples showing wrong vs right epic breakdown
- Epics now created AFTER architecture for technically-informed story breakdown
- Added checkpoint protocol for interactive workflow progression

### 2. Removed Deprecated Solutioning Gate Check
- Deleted entire solutioning-gate-check workflow (682 lines)
- Replaced by new implementation-readiness workflow
- Cleaner separation of concerns in solutioning phase

### 3. PRD Template Simplification
- Removed hardcoded "Implementation Planning", "References", and "Next Steps" sections
- PRD now focuses purely on requirements, not workflow orchestration
- Epics/stories created as separate step after architecture

### 4. Documentation Overhaul (15+ docs updated)
- Updated quick-start guide with v6 workflow sequence
- Clarified that epics are created AFTER architecture, not during PRD
- Updated solutioning docs to reflect implementation-readiness pattern
- Improved agents-guide, brownfield-guide, enterprise docs
- Enhanced glossary, FAQ, and workflow reference documentation

### 5. Workflow Path Adjustments
- All 4 paths updated (enterprise/method × brownfield/greenfield)
- Version bumps across BMGD, BMM, and CIS workflow YAMLs
- Minor instruction file updates for consistency

### Files Changed
- 65 files total: 468 insertions, 978 deletions (net reduction of 510 lines)
- 4 files deleted (entire solutioning-gate-check workflow)
- 1 new directory added (implementation-readiness placeholder)
This commit is contained in:
Brian Madison
2025-11-16 00:23:47 -06:00
parent 5980e41a28
commit 6f7e9f0653
65 changed files with 562 additions and 352 deletions

View File

@@ -77,7 +77,7 @@ The methodology path (Quick Flow, BMad Method, or Enterprise Method) chosen for
### PRD (Product Requirements Document)
**BMad Method/Enterprise tracks.** Product-level planning document containing vision, goals, feature requirements, epic breakdown, success criteria, and UX considerations. Replaces tech-spec for larger projects that need product planning.
**BMad Method/Enterprise tracks.** Product-level planning document containing vision, goals, Functional Requirements (FRs), Non-Functional Requirements (NFRs), success criteria, and UX considerations. Replaces tech-spec for larger projects that need product planning. **V6 Note:** PRD focuses on WHAT to build (requirements). Epic+Stories are created separately AFTER architecture via create-epics-and-stories workflow.
### Architecture Document
@@ -263,7 +263,7 @@ Workflow that initializes Phase 4 implementation by creating sprint-status.yaml,
### Gate Check
Validation workflow (solutioning-gate-check) run before Phase 4 to ensure PRD, architecture, and UX documents are cohesive with no gaps or contradictions. Required for BMad Method and Enterprise Method tracks.
Validation workflow (implementation-readiness) run before Phase 4 to ensure PRD, architecture, and UX documents are cohesive with no gaps or contradictions. Required for BMad Method and Enterprise Method tracks.
### DoD (Definition of Done)