# Retrospective - Epic Completion Review Instructions
2025-10-03 21:46:53 -05:00
< critical > The workflow execution engine is governed by: {project-root}/bmad/core/tasks/workflow.xml< / critical >
2025-09-28 23:17:07 -05:00
< critical > You MUST have already loaded and processed: {project-root}/bmad/bmm/workflows/4-implementation/retrospective/workflow.yaml< / critical >
< critical >
FACILITATION NOTES:
2025-10-05 11:32:45 -05:00
- Scrum Master facilitates this retrospective
2025-09-28 23:17:07 -05:00
- Psychological safety is paramount - NO BLAME
- Focus on systems, processes, and learning
- Everyone contributes with specific examples preferred
- Action items must be achievable with clear ownership
- Two-part format: (1) Epic Review + (2) Next Epic Preparation
< / critical >
< workflow >
2025-10-12 22:19:28 -05:00
< step n = "1" goal = "Check and load workflow status file" >
< action > Search {output_folder}/ for files matching pattern: project-workflow-status*.md< / action >
< action > Find the most recent file (by date in filename: project-workflow-status-YYYY-MM-DD.md)< / action >
< check if = "exists" >
< action > Load the status file< / action >
< action > Set status_file_found = true< / action >
< action > Store status_file_path for later updates< / action >
< / check >
< check if = "not exists" >
< ask > **No workflow status file found.**
This workflow conducts epic retrospective (optional Phase 4 workflow).
Options:
1. Run workflow-status first to create the status file (recommended for progress tracking)
2. Continue in standalone mode (no progress tracking)
3. Exit
What would you like to do?< / ask >
< action > If user chooses option 1 → HALT with message: "Please run workflow-status first, then return to retrospective"< / action >
< action > If user chooses option 2 → Set standalone_mode = true and continue< / action >
< action > If user chooses option 3 → HALT< / action >
< / check >
< / step >
< step n = "2" goal = "Epic Context Discovery" >
2025-09-28 23:17:07 -05:00
< action > Identify the completed epic< / action >
< ask > Which epic has just been completed? (Enter epic number, e.g., "003" or auto-detect from highest completed story)< / ask >
2025-10-05 11:32:45 -05:00
< check if = "auto-detecting" >
< action > Check {output_folder}/stories/ for highest numbered completed story< / action >
< action > Extract epic number from story file (e.g., "Epic: 003" section)< / action >
< / check >
2025-09-28 23:17:07 -05:00
< action > Load the completed epic from: {output_folder}/prd/epic-{{epic_number}}.md< / action >
2025-10-05 11:32:45 -05:00
< action > Extract epic details:
2025-09-28 23:17:07 -05:00
- Epic title and goals
- Success criteria
- Planned stories and story points
- Estimated sprint duration
- Business objectives
2025-10-05 11:32:45 -05:00
< / action >
2025-09-28 23:17:07 -05:00
< action > Find all stories for this epic in {output_folder}/stories/< / action >
2025-10-05 11:32:45 -05:00
< action > For each story, extract: - Story number and title - Completion status - Story points (if tracked) - Actual completion date - Dev Agent Record notes - TEA Results and testing outcomes - PO Notes and acceptance - Blockers encountered and resolution - Technical debt incurred
< / action >
< action > Calculate epic metrics: - Completed stories vs. total planned - Actual story points delivered vs. planned - Actual sprints taken vs. estimated - Velocity (points per sprint) - Blocker count - Technical debt items logged
< / action >
2025-09-28 23:17:07 -05:00
< action > Review epic goals and compare actual outcomes vs. planned< / action >
< action > Note any scope changes or descoped items< / action >
< action > Document key architectural decisions made during epic< / action >
< action > Identify technical debt incurred and why< / action >
< / step >
< step n = "2" goal = "Preview Next Epic" >
< action > Identify the next epic in sequence< / action >
< action > Load next epic from: {output_folder}/prd/epic-{{next_epic_number}}.md< / action >
2025-10-05 11:32:45 -05:00
< action if = "next epic exists" >
Analyze next epic for:
- Epic title and objectives
- Planned stories and complexity
- Dependencies on completed epic work
- New technical requirements or capabilities needed
- Potential risks or unknowns
< / action >
2025-09-28 23:17:07 -05:00
2025-10-05 11:32:45 -05:00
< action > Identify dependencies on completed work:
2025-09-28 23:17:07 -05:00
- What components from Epic {{completed_number}} does Epic {{next_number}} rely on?
- Are all prerequisites complete and stable?
- Any incomplete work that creates blocking dependencies?
2025-10-05 11:32:45 -05:00
< / action >
2025-09-28 23:17:07 -05:00
2025-10-05 11:32:45 -05:00
< action > Note potential gaps or preparation needed:
2025-09-28 23:17:07 -05:00
- Technical setup required (infrastructure, tools, libraries)
- Knowledge gaps to fill (research, training, spikes)
- Refactoring needed before starting next epic
- Documentation or specifications to create
2025-10-05 11:32:45 -05:00
< / action >
2025-09-28 23:17:07 -05:00
2025-10-05 11:32:45 -05:00
< action > Check for technical prerequisites:
2025-09-28 23:17:07 -05:00
- APIs or integrations that must be ready
- Data migrations or schema changes needed
- Testing infrastructure requirements
- Deployment or environment setup
2025-10-05 11:32:45 -05:00
< / action >
< / step >
2025-09-28 23:17:07 -05:00
< step n = "3" goal = "Initialize Retrospective with Context" >
2025-10-05 11:32:45 -05:00
< action > Scrum Master opens the retrospective with context< / action >
< action > Present formatted retrospective header:
2025-09-28 23:17:07 -05:00
```
🔄 TEAM RETROSPECTIVE - Epic {{epic_number}}: {{epic_title}}
2025-10-05 11:32:45 -05:00
Scrum Master facilitating
2025-09-28 23:17:07 -05:00
═══════════════════════════════════════════════════════════
EPIC {{epic_number}} SUMMARY:
Delivery Metrics:
- Completed: {{completed_stories}}/{{total_stories}} stories ({{completion_percentage}}%)
- Velocity: {{actual_points}} story points (planned: {{planned_points}})
- Duration: {{actual_sprints}} sprints (planned: {{planned_sprints}})
- Average velocity: {{points_per_sprint}} points/sprint
2025-09-29 20:19:14 -05:00
Quality and Technical:
2025-09-28 23:17:07 -05:00
- Blockers encountered: {{blocker_count}}
- Technical debt items: {{debt_count}}
- Test coverage: {{coverage_info}}
- Production incidents: {{incident_count}}
Business Outcomes:
- Goals achieved: {{goals_met}}/{{total_goals}}
- Success criteria: {{criteria_status}}
- Stakeholder feedback: {{feedback_summary}}
═══════════════════════════════════════════════════════════
NEXT EPIC PREVIEW: Epic {{next_number}}: {{next_epic_title}}
Dependencies on Epic {{epic_number}}:
{{list_dependencies}}
Preparation Needed:
{{list_preparation_gaps}}
Technical Prerequisites:
{{list_technical_prereqs}}
═══════════════════════════════════════════════════════════
Team assembled for reflection:
{{list_agents_based_on_story_records}}
Focus Areas:
1. Learning from Epic {{epic_number}} execution
2. Preparing for Epic {{next_number}} success
```
2025-10-05 11:32:45 -05:00
< / action >
< action > Load agent configurations from {agent-manifest}< / action >
< action > Ensure key roles present from the {agent_manifest}: Product Owner, Scrum Master (facilitating the retro), Devs, Testing or QA, Architect, Analyst< / action >
2025-09-28 23:17:07 -05:00
< / step >
< step n = "4" goal = "Epic Review Discussion" >
2025-10-05 11:32:45 -05:00
< action > Scrum Master facilitates Part 1: Reviewing the completed epic< / action >
2025-09-28 23:17:07 -05:00
< action > Each agent shares in their unique voice, referencing actual story data< / action >
< action > Maintain psychological safety - focus on learning, not blame< / action >
< action > For each participating agent, present structured feedback:< / action >
**{{Agent Name}} ({{Role}})**:
**What Went Well:**
- Successes from completed stories (cite specific examples)
- Effective practices or processes that worked
- Velocity achievements or quality wins
- Collaboration highlights
- Technical successes or good decisions
**What Could Improve:**
- Challenges from story records (cite specifics)
- Blockers that slowed progress and why
- Process friction or inefficiencies
- Technical debt incurred and rationale
- Communication or coordination issues
**Lessons Learned:**
- Key insights for future epics
- Patterns to repeat or avoid
- Skills or knowledge gained
- Process improvements to implement
2025-10-05 11:32:45 -05:00
< action > Agent personality guidance:
Each agent loaded from {agent_manifest} will interact with their role and personality and communication style best represented and simulated during discussions
< / action >
2025-09-28 23:17:07 -05:00
< action > Encourage specific examples from story records, metrics, and real outcomes< / action >
2025-10-05 11:32:45 -05:00
< action > Scrum Master synthesizes common themes as discussion progresses< / action >
2025-09-28 23:17:07 -05:00
< / step >
< step n = "5" goal = "Next Epic Preparation Discussion" >
2025-10-05 11:32:45 -05:00
< action > Scrum Master facilitates Part 2: Preparing for the next epic< / action >
2025-09-28 23:17:07 -05:00
< action > Each agent addresses preparation needs from their domain< / action >
< action > For each agent, present forward-looking analysis:< / action >
**{{Agent Name}} ({{Role}})**:
**Dependencies Check:**
- What from Epic {{completed_number}} is needed for Epic {{next_number}}?
- Any incomplete work that could block us?
- Integration points or handoffs to verify?
**Preparation Needs:**
- Technical setup required before starting
- Knowledge gaps to fill (research, training, spikes)
- Refactoring or cleanup needed
- Documentation or specifications to create
- Tools or infrastructure to provision
**Risk Assessment:**
- Potential issues based on Epic {{completed_number}} experience
- Unknowns or uncertainties in Epic {{next_number}}
- Mitigation strategies to consider
- Early warning signs to watch for
< action > Focus on actionable preparation items< / action >
< action > Identify dependencies between preparation tasks< / action >
< action > Note any quick wins that could de-risk the next epic< / action >
< / step >
< step n = "6" goal = "Synthesize Action Items" >
2025-10-05 11:32:45 -05:00
< action > Scrum Master identifies patterns across all agent feedback< / action >
2025-09-28 23:17:07 -05:00
< action > Synthesizes common themes into team agreements< / action >
< action > Creates specific, achievable action items with clear ownership< / action >
< action > Develops preparation sprint tasks if significant setup needed< / action >
2025-10-05 11:32:45 -05:00
< action > Present comprehensive action plan:
2025-09-28 23:17:07 -05:00
```
═══════════════════════════════════════════════════════════
📝 EPIC {{completed_number}} ACTION ITEMS:
Process Improvements:
1. {{action_item}} (Owner: {{agent}}, By: {{timeline}})
2. {{action_item}} (Owner: {{agent}}, By: {{timeline}})
3. {{action_item}} (Owner: {{agent}}, By: {{timeline}})
Technical Debt:
1. {{debt_item}} (Owner: {{agent}}, Priority: {{high/medium/low}})
2. {{debt_item}} (Owner: {{agent}}, Priority: {{high/medium/low}})
Documentation:
1. {{doc_need}} (Owner: {{agent}}, By: {{timeline}})
Team Agreements:
- {{agreement_1}}
- {{agreement_2}}
- {{agreement_3}}
═══════════════════════════════════════════════════════════
🚀 EPIC {{next_number}} PREPARATION SPRINT:
Technical Setup:
[ ] {{setup_task}} (Owner: {{agent}}, Est: {{hours/days}})
[ ] {{setup_task}} (Owner: {{agent}}, Est: {{hours/days}})
Knowledge Development:
[ ] {{research_task}} (Owner: {{agent}}, Est: {{hours/days}})
[ ] {{spike_task}} (Owner: {{agent}}, Est: {{hours/days}})
Cleanup/Refactoring:
[ ] {{refactor_task}} (Owner: {{agent}}, Est: {{hours/days}})
[ ] {{cleanup_task}} (Owner: {{agent}}, Est: {{hours/days}})
Documentation:
[ ] {{doc_task}} (Owner: {{agent}}, Est: {{hours/days}})
Total Estimated Effort: {{total_hours}} hours ({{total_days}} days)
═══════════════════════════════════════════════════════════
⚠️ CRITICAL PATH:
Blockers to Resolve Before Epic {{next_number}}:
1. {{critical_item}} (Owner: {{agent}}, Must complete by: {{date}})
2. {{critical_item}} (Owner: {{agent}}, Must complete by: {{date}})
Dependencies Timeline:
{{timeline_visualization_of_critical_dependencies}}
Risk Mitigation:
- {{risk}}: {{mitigation_strategy}}
- {{risk}}: {{mitigation_strategy}}
```
2025-10-05 11:32:45 -05:00
< / action >
2025-09-28 23:17:07 -05:00
< action > Ensure every action item has clear owner and timeline< / action >
< action > Prioritize preparation tasks by dependencies and criticality< / action >
< action > Identify which tasks can run in parallel vs. sequential< / action >
< / step >
< step n = "7" goal = "Critical User Verification" >
2025-10-05 11:32:45 -05:00
< action > Scrum Master leads final verification checks before concluding retrospective< / action >
2025-09-28 23:17:07 -05:00
< action > User must confirm readiness before next epic begins< / action >
< ask > Let's verify Epic {{completed_number}} is truly complete. Please confirm each item:< / ask >
**Testing Verification:**
< ask > Has full regression testing been completed for Epic {{completed_number}}? (yes/no/partial)< / ask >
2025-10-05 11:32:45 -05:00
< action if = "no or partial" > Add to Critical Path: Complete regression testing before Epic {{next_number}}< / action >
2025-09-28 23:17:07 -05:00
**Deployment Status:**
2025-10-05 11:32:45 -05:00
2025-09-28 23:17:07 -05:00
< ask > Has Epic {{completed_number}} been deployed to production? (yes/no/scheduled)< / ask >
2025-10-05 11:32:45 -05:00
< action if = "no deployment to prod" > Add to Critical Path: Deploy Epic {{completed_number}} - scheduled for {{date}}< / action >
2025-09-28 23:17:07 -05:00
**Business Validation:**
< ask > Have stakeholders reviewed and accepted Epic {{completed_number}} deliverables? (yes/no/pending)< / ask >
2025-10-05 11:32:45 -05:00
< action if = "no or pending deliverables" > Add to Critical Path: Obtain stakeholder acceptance before Epic {{next_number}}< / action >
2025-09-28 23:17:07 -05:00
**Technical Health:**
< ask > Is the codebase in a stable, maintainable state after Epic {{completed_number}}? (yes/no/concerns)< / ask >
2025-10-05 11:32:45 -05:00
< check if = "not stable or maintainable or concerns about codebase" >
< action > Document concerns: {{user_input}}< / action >
< action > Add to Preparation Sprint: Address stability concerns< / action >
< / check >
2025-09-28 23:17:07 -05:00
**Blocker Resolution:**
< ask > Are there any unresolved blockers from Epic {{completed_number}} that will impact Epic {{next_number}}? (yes/no)< / ask >
2025-10-05 11:32:45 -05:00
< check if = "yes unresolved blockers exist" >
< action > Document blockers: {{user_input}}< / action >
< action > Add to Critical Path with highest priority< / action >
< / check >
< action > Summarize the verification results and any critical items added< / action >
2025-09-28 23:17:07 -05:00
< / step >
< step n = "8" goal = "Retrospective Closure" >
2025-10-05 11:32:45 -05:00
< action > Scrum Master closes the retrospective with summary and next steps< / action >
2025-09-28 23:17:07 -05:00
< action > Present closure summary:< / action >
```
═══════════════════════════════════════════════════════════
✅ RETROSPECTIVE COMPLETE
Epic {{completed_number}}: {{epic_title}} - REVIEWED
Key Takeaways:
- {{key_lesson_1}}
- {{key_lesson_2}}
- {{key_lesson_3}}
Action Items Committed: {{action_count}}
Preparation Tasks Defined: {{prep_task_count}}
Critical Path Items: {{critical_count}}
═══════════════════════════════════════════════════════════
🎯 NEXT STEPS:
1. Execute Preparation Sprint (Est: {{prep_days}} days)
2. Complete Critical Path items before Epic {{next_number}}
3. Review action items in next standup
4. Begin Epic {{next_number}} planning when preparation complete
═══════════════════════════════════════════════════════════
2025-10-05 11:32:45 -05:00
Scrum Master: "Great work team! We learned a lot from Epic {{completed_number}}.
2025-09-28 23:17:07 -05:00
Let's use these insights to make Epic {{next_number}} even better.
See you at sprint planning once prep work is done!"
```
< action > Save retrospective summary to: {output_folder}/retrospectives/epic-{{completed_number}}-retro-{{date}}.md< / action >
< action > Confirm all action items have been captured< / action >
< action > Remind user to schedule prep sprint if needed< / action >
< / step >
2025-10-12 22:19:28 -05:00
< step n = "9" goal = "Update status file on completion" >
< action > Search {output_folder}/ for files matching pattern: project-workflow-status*.md< / action >
< action > Find the most recent file (by date in filename)< / action >
< check if = "status file exists" >
< action > Load the status file< / action >
< template-output file = "{{status_file_path}}" > current_step< / template-output >
< action > Set to: "retrospective (Epic {{completed_number}})"< / action >
< template-output file = "{{status_file_path}}" > current_workflow< / template-output >
< action > Set to: "retrospective (Epic {{completed_number}}) - Complete"< / action >
< template-output file = "{{status_file_path}}" > progress_percentage< / template-output >
< action > Increment by: 5% (optional epic boundary workflow)< / action >
< template-output file = "{{status_file_path}}" > decisions_log< / template-output >
< action > Add entry:< / action >
```
- **{{date}}**: Completed retrospective for Epic {{completed_number}}. Action items: {{action_count}}. Preparation tasks: {{prep_task_count}}. Critical path items: {{critical_count}}. Next: Execute preparation sprint before beginning Epic {{next_number}}.
```
< output > **✅ Retrospective Complete**
**Epic Review:**
- Epic {{completed_number}}: {{epic_title}} reviewed
- Action Items: {{action_count}}
- Preparation Tasks: {{prep_task_count}}
- Critical Path Items: {{critical_count}}
**Status file updated:**
- Current step: retrospective (Epic {{completed_number}}) ✓
- Progress: {{new_progress_percentage}}%
**Next Steps:**
1. Review retrospective summary: {output_folder}/retrospectives/epic-{{completed_number}}-retro-{{date}}.md
2. Execute preparation sprint (Est: {{prep_days}} days)
3. Complete critical path items before Epic {{next_number}}
4. Begin Epic {{next_number}} planning when preparation complete
Check status anytime with: `workflow-status`
< / output >
< / check >
< check if = "status file not found" >
< output > **✅ Retrospective Complete**
**Epic Review:**
- Epic {{completed_number}}: {{epic_title}} reviewed
- Retrospective saved: {output_folder}/retrospectives/epic-{{completed_number}}-retro-{{date}}.md
Note: Running in standalone mode (no status file).
**Next Steps:**
1. Execute preparation sprint
2. Begin Epic {{next_number}} planning
< / output >
< / check >
< / step >
2025-09-28 23:17:07 -05:00
< / workflow >
< facilitation-guidelines >
2025-10-05 11:32:45 -05:00
< guideline > Scrum Master maintains psychological safety throughout - no blame or judgment< / guideline >
2025-09-28 23:17:07 -05:00
< guideline > Focus on systems and processes, not individual performance< / guideline >
< guideline > Encourage specific examples over general statements< / guideline >
< guideline > Balance celebration of wins with honest assessment of challenges< / guideline >
< guideline > Ensure every voice is heard - all agents contribute< / guideline >
< guideline > Action items must be specific, achievable, and owned< / guideline >
< guideline > Forward-looking mindset - how do we improve for next epic?< / guideline >
< guideline > Two-part structure ensures both reflection AND preparation< / guideline >
< guideline > Critical verification prevents starting next epic prematurely< / guideline >
< guideline > Document everything - retrospective insights are valuable for future reference< / guideline >
< / facilitation-guidelines >